Parts Provided - GE Monogram ZV30R Installation Instructions Manual

30", 36" and 48" professional restaurant style vent hoods
Hide thumbs Also See for Monogram ZV30R:
Table of Contents

Advertisement

PARTS PROVIDED

Locate the parts packed with the hood.
Duct Transition
with Damper
Heat Lamp
(2 with 48" models)
Allen Wrench
For Implement Rods
HARDWARE
PACKAGE
Locate and check contents.
Screws shown actual size.
Note: Hardware appearance
may vary slightly.
2 flat washers
for wall anchors
6 (3/16") hollow wall anchors
with screws use 2 to secure
hood to the wall at the bottom.
Use 4 to secure backguard
and shelf.
10 Phillips head screws.
Use 6 to secure hood to the
wood support. (2 are
secured to wood support)
Use 2 to secure 30" and 36"
backguards to wall. Use 4 to
secure a 48" backguard.
Installation Preparation
2 Stainless Steel Grease Filters
(3 filters with 48" models)
2 Implement Rods and 4 Stand-offs
Grease Tray
4 Phillips head screws to
secure the duct transition to
the hood outlet on the top.
2 Phillips head machine
screws to secure shelf to
2 shoulder screws
to secure shelf to
bottom of hood.
bottom of hood.
9
Wood Support
with Original Screws
Backguard
Warming Shelf
4 screws to secure the wood
support to the wall
POZIDRIV 3
1 hex head safety screw
and lock washer, to
secure the blower.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zv48rMonogram zv36r

Table of Contents