Step 9, Install Shelf Only; Step 10 Install Implement Rods - GE Monogram ZV30R Installation Instructions Manual

30", 36" and 48" professional restaurant style vent hoods
Hide thumbs Also See for Monogram ZV30R:
Table of Contents

Advertisement

STEP 9 INSTALL SHELF "ONLY"
• Remove shelf packaging and protective film.
• If installing the shelf alone, without the backguard,
place shelf against the bottom of the hood and mark
screw hole locations "B" on the wall.
• Drill two 1/8" pilot holes.
• If drill did not enter studs, enlarge holes to 3/8".
• Insert wall anchors into enlarged holes. Remove
screws from wall anchors.
• Install two shoulder screws into holes "D" in the
bottom of hood flange leaving 1/8" gap.
• Engage shoulder screws into the keyhole slots in the
top of the shelf. Slide shelf towards the left to lock
into place.
• Install two 3/4" long machine screws through the
bottom of the shelf into the bottom hood flange,
location "E".
D
E
B
Mounting
Holes
for Shelf (B)
Installation Instructions
1/8"
Gap
E
D
B
STEP 10 INSTALL IMPLEMENT
RODS
• Use a flat blade screwdriver to install stand-offs into
the bottom of the hood.
• Align implement rod to stand-offs with the screw hole
towards the inside of the hood. Secure the rod to the
stand-offs with the supplied Allen wrench.
• Follow the same procedure on the opposite side.
FINALIZE INSTALLATION
• Install the supplied infrared bulb(s).
• See the Owner's Manual for instructions to test
operation.
15
Screw
Stand-offs
Into
Hood
Use Allen
Wrench to
Secure Rod
to Stand-offs

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zv48rMonogram zv36r

Table of Contents