Mounting the upper chimney panelling Alternative installation sequence Mounting the lower chimney panel Insert vent Inserting the control part. Fastening the motor and fume trap Installing the mesh again Guideline for extraction paths..22 IKD 954.1...
– appliance finishing cooking finishing cooking Position of Door open closed Window closed open The room Moisture — air is Heat — cleaned of Support bracket Odours Remove the support bracket and – pull out the fat filter. IKD 954.1...
Unscrew the mesh under the – fume trap and remove. Pull the spotlight down out of the – socket. Insert a new spotlight (20 Watt) into the socket with slight pressure and – mount the mesh again. IKD 954.1...
If the exhaust air is extracted upwards, the control line of the external motor must come out of the ceiling (approx. 1000 mm free cable length) in additi- on to the extraction channel (150 mm in diameter) and the domestic power duct at the installation point of the hood. IKD 954.1...
– tom with the enclosed clips. Fit the reduction piece (B) firmly – to the vent (D) by the motor. Place the deflector (A) with the ex- – haust outlet facing outwards on the reduction piece (B). IKD 954.1...
Secure the switch and control unit – above the middle strip in the hood Venting operation: Insert the vent – opening with two screws. as a decorative plate in the open- ing in the lower flue. IKD 954.1...
Extraction through the kitchen ceiling and roof The height of the exhaust pipe must not exceed 2.5 m. The pipe must be heat insulated or an air-trap seal must be installed. IKD 954.1...
Need help?
Do you have a question about the IKD 954.1 and is the answer not in the manual?
Questions and answers