Weider 9150 User Manual page 9

Uk manual
Hide thumbs Also See for 9150:
Table of Contents

Advertisement

9. Press a 50mm Square Inner Cap (44) into the
end of the Right Butterfly Arm (48). Press a
Sleeve (89) into the Right Butterfly Arm.
Wet the lower end of the Right Butterfly Arm (48)
with soapy water. Slide a Large Foam Pad (45)
onto the Right Butterfly Arm.
Repeat this step with the Left Butterfly Arm
(47).
10. Lubricate the axles on the Top Frame (55). Orient
the Right Butterfly Arm (48) as shown and slide it
onto the right axle. Be sure the Butterfly Arm is
behind the bracket on the Top Frame.
Have a second person secure the Right Butterfly
Arm (48) to the axle with two 25mm Retainers
(68) and a 25mm Cover Cap (65). Note: Place
the Retainers on top of the inverted Cover
Cap, as shown in the inset drawing. Make
sure the teeth on the Retainers bend toward
the Cover Cap. Gently tap the Cover Cap onto
the axle.
Repeat this step with the Left Butterfly Arm
(47).
Cable Assembly
11. For cable identification and routing during
steps 11 to 25, refer to the CABLE DIAGRAMS
on page 20. Do not overtighten the bolts and
locknuts that secure the pulleys; the pulleys
must be able to rotate freely.
Locate the High Cable (23), which has a ball on
one end and a bolt on the other. Route the bolt
end of the Cable up through the Top Frame (55)
and around a "V"-Pulley (6). Attach the Pulley
inside the Top Frame with an M10 x 75mm Bolt
(76), two 12.5mm Spacers (82), two M10
Washers (9), and an M10 Nylon Locknut (21).
9
89
10
48
11
21
9
47
48
45
44
45
44
55
Bracket
Lubricate
Axle
68
65
Axle
68
65
23
76
6
82
55
9
82
9
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Weevsy49220

Table of Contents