12
SERVICE WORK ON THE CHASSIS
–
Tighten screw
Guideline
Screw, top steering stem
B01522-11
–
Tighten screws
Guideline
Screw, top triple clamp
–
Secure the wiring harness with cable holder
B01521-11
–
Position the brake caliper. Mount and tighten screws
Guideline
Screw, front brake caliper
–
Mount cable binder
–
Position the brake line, wiring harness, and clamp. Mount and tighten screws
101326-11
Finishing work
–
Mount the handlebar cushion.
–
Install the front fender. (
–
Install the front wheel.
–
Refit the headlight mask with the headlight. (
–
Check that the wiring harness, throttle cables and brake and clutch lines can move
freely and are routed correctly.
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
–
Check the headlight setting. (
.
8
.
9
M8
.
bm
p. 66)
(
p. 90)
x
p. 100)
M8
20 Nm
(14.8 lbf ft)
M8
20 Nm
(14.8 lbf ft)
.
bk
.
bl
25 Nm
Loctite
(18.4 lbf ft)
p. 99)
p. 64)
p. 56)
62
®
243™
.
bn