GE EPM 7300 Installation Manual page 157

General electric pmcs interface toolkit installation guide
Table of Contents

Advertisement

149
Over Pickup for Over KW, Over Current, and Over Vunbal.
Time On for Over KW, Over Current, and Over Vunbal.
Time Off for Over KW, Over Current, and Over Vunbal.
The Setup 2 tab also provides push buttons for performing the following commands:
Download– Executes a script to check for values that have changed and downloads
those values to the device via the GE 7700 Gateway.
Refresh– .Executes a script to upload all of the meter values for the settings on the
screen.
Note: Be sure to click the Refresh button prior to changing or downloading any
settings to the EPM7700, as the latest settings may not be displayed.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Epm 7700Epm9650qGeh-6513Epm5200pPmcs 6.11aEpm9450q

Table of Contents