Yamaha YZ250(V) Owner's Service Manual page 306

Yz series
Table of Contents

Advertisement

KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
4. Install:
9 Bolt (shift guide) 1
EC4C5310
Shift shaft
1. Install:
9 Roller 1
9 Plain washer 2
9 Shift shaft 3
NOTE:
Apply the transmission oil on the roller and shift
shaft.
EC4C5602
Kick axle assembly
1. Install:
9 Kick gear 1
9 Plain washer 2
9 Circlip 3
9 Ratchet wheel 4
9 Spring 5
9 Plain washer 6
9 Circlip 7
To kick axle 8.
NOTE:
9 Apply the transmission oil on the kick gear
inner circumference.
9 Align the punch mark a on the ratchet wheel
with the punck mark b on the kick axle.
2. Install:
9 Torsion spring 1
To kick axle 2.
NOTE:
Make sure the stopper a of the torsion spring
fits into the hole b on the kick axle.
4-45
ENG
10 Nm (1.0 m•kg, 7.2 ft•lb)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yz250

Table of Contents