Yamaha YZ250(V) Owner's Service Manual page 304

Yz series
Table of Contents

Advertisement

KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
EC4C5000
ASSEMBLY AND INSTALLATION
EC4C5130
Stopper lever
1. Install:
9 Tension spring 1
9 Holder 2
9 Bolt (holder) 3
9 Plain washer 4
9 Stopper lever 5
9 Bolt (stopper lever) 6
NOTE:
Align the stopper lever roller with the slot on seg-
ment.
EC4C5202
Shift guide and shift lever assembly
1. Install:
9 Spring 1
9 Pawl pin 2
9 Pawl 3
To shift lever 4.
2. Install:
9 Shift lever assembly 1
To shift guide 2.
3. Install:
9 Shift lever assembly 1
9 Shift guide 2
NOTE:
9 The shift lever assembly is installed at the
same time as the shift guide.
9 Apply the transmission oil on the bolt (segment)
shaft.
4-44
ENG
10 Nm (1.0 m•kg, 7.2 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yz250

Table of Contents