Installation; Inspecting The Equipment; Unpacking The Cabinet - HP R3000v User Manual

Table of Contents

Advertisement

Chapter 3

Inspecting the Equipment

Unpacking the Cabinet

Installation

This section explains:
S
Equipment inspection
S
Unpacking the cabinet
S
Checking the accessory kit
S
Cabinet installation
S
Wiring installation
S
Initial startup
S
UPS rear panel
If any equipment has been damaged during shipment, keep the shipping cartons and
packing materials for the carrier or place of purchase and file a claim for shipping damage.
If you discover damage after acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier within
15 days of receipt of the equipment; 2) Send a copy of the damage claim within 15 days
to your service representative.
NOTE: Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.
S
Unpacking the cabinet in a low-temperature environment may cause condensation to occur
in and on the cabinet. Do not install the cabinet until the inside and outside of the cabinet
are absolutely dry (hazard of electric shock).
S
The cabinet is heavy (see page 35). Use caution to unpack and move the cabinet.
Use care when moving and opening the carton. Leave the components packaged until you
are ready to install.
To unpack the cabinet and accessories:
1. Open the outer carton and remove the accessories packaged with the cabinet.
2. Carefully lift the cabinet out of the outer carton.
3. Discard or recycle the packaging in a responsible manner, or store it for future use.
Place the cabinet in a protected area that has adequate airflow and is free of humidity,
flammable gas, and corrosion.
C A U T I O N
HP R3000v UPS User Guide
S
164201731 Rev 1
5

Advertisement

Chapters

Table of Contents
loading

Table of Contents