The Keston Qudos 28s and Qudos 28sP are supplied almost totally pre-assembled. The units
use standard 50 mm muPVC (BS5255 and/or BSEN1566-1 and BSEN1329) pipe for the flue
and air intake systems. The boiler is packed in a single box without additional flue kit. All
additional components are packed inside the boiler cabinet itself. The following is a list of
components and their location in the boiler cabinet
Equipment List
Item
Wall Bracket Rawl Plugs
Wall Bracket Wall Fixing Screws
Wall Mounting Bracket
Wall Mounting Bracket Nuts
Wall Mounting Bracket Washers
Wall Bracket Bolt Insulation
50 mm muPVC Air/Flue Terminals
Air Inlet Spigot (50 mm)
Flue Outlet Spigot (50 mm)
Air Inlet Spigot Gasket
Air Inlet Spigot + Flue Outlet Spigot M6 Screws 4+2
Cabinet Cable Entry Clamps
Gas Isolating Cock
Condensate Trap
Condensate Trap fixing screws
Condensate Trap fixing washers
Condensate Trap Gasket
50 mm muPVC Pipe
50 mm muPVC Elbow
Document List
Item
Registration of Purchase
Installation Template
Remove the cabinet shell by removing the two retaining screws in the top of the cabinet and
the two retaining screws in the bottom of the cabinet.
0.2

RECOMMENDED HANDLING PROCEDURE

NB : The following lift operation exceeds the recommended weight for a one-man lift as
specified in the Manual Handling Operations 1992 Regulations.
For the carriage of carton it is recommended at least two people perform any lift. Clear the
carriage route of the carton from point of delivery to point of installation. Take care to avoid trip
hazards, slippery or wet surfaces and when climbing steps and stairs. Always use assistance
if required. If a sack truck is used it is recommended the carton is strapped to the truck.
For the unpacking of the appliance from the carton, it is recommended at least two people
perform any lift. It is recommended to cut the base end of carton and open the carton flaps.
Ensure the protective packing over the boiler tappings at the base of the boiler is kept in place,
then tilt the boiler forwards from its back onto its base and remove carton by sliding up over
the boiler. When lifting this appliance the back should be kept straight at all times. Avoid

0. HANDLING INSTRUCTIONS

The Keston Qudos 28s & Qudos 28sP Boilers
Quantity
6
Inside accessories bag
6
Inside accessories bag
1
Secured to inside right
hand side of boiler case
1
Inside accessories bag.
1+1
Inside accessories bag
1
Inside accessories bag
2
Inside accessories bag
1
Inside accessories bag
1
Inside accessories bag
1
Inside accessories bag
Inside accessories bag
2
Inside accessories bag
1
Inside accessories bag
1
Inside accessories bag
2
Inside accessories bag
2
Inside accessories bag
1
Inside accessories bag
2
Inside boiler case
2
Inside boiler case
Quantity
Location
1
In A4 envelope
1
In document bag
Location
Page : iii

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qudos 28sp

Table of Contents