WD352/0/2003
0.1
LIST OF CONTENTS
The Keston C90 and C110 are supplied almost totally pre-assembled. Since the units use 100
mm Keston Composite pipe for the flue and air intake systems the boiler is packed in a single
box without additional flue kit. All additional components are packed inside the boiler cabinet
itself. The following is a list of components and their location in the boiler cabinet
Equipment List
Item
Wall Bracket Rawl Plugs
Wall Bracket Wall Fixing Screws
Wall Mounting Bracket
100 mm Air/Flue Terminals
Cabinet Cable Entry Clamps
User Control Knobs
Boiler Lifting Handles
Outside Temperature Sensor
Document List
Item
User Instructions
Registration of Purchase
Installation Template
Remove the cabinet door by removing the two retaining screws in the top of the cabinet front
panel and lift the front panel away from the cabinet.
0.2
Recommended Handling Procedure CAUTION - HEAVY UNIT - MULTI-PERSON LIFT
NB : The following lift operation exceeds the recommended weight for a one-man lift as
specified in the Manual Handling Operations 1992 Regulations.
For the carriage of carton it is recommended at least four people perform any lift. Clear the
carriage route of the carton from point of delivery to point of installation. Take care to avoid trip
hazards, slippery or wet surfaces and when climbing steps and stairs. Always use assistance
if required.
For the unpacking of the appliance from the carton, it is recommended at least four people
perform any lift. It is recommended to open the plywood panels above and to the side using a
claw hammer taking care to avoid the exposed nails. When lifting this appliance the back
should be kept straight at all times. Avoid twisting at the waist - reposition the feet instead.
Avoid upper body bending when holding the appliance and keep the boiler as close to the
body as possible.
When ready to hang the boiler on the wall stand the boiler on its base and insert the lifting
handles in each side of the boiler. At this stage it is assumed that the wall bracket is correctly
secured on the wall face.
a)
The boiler has a dry weight of 127 kg (280 lbs) and will therefore require at least four
people to lift without the use of lifting aids.
b)
Lift the boiler using the lifting handle inserted into each side of the boiler. When lifting this
appliance the back should be kept straight at all times. Avoid twisting at the waist -
reposition the feet instead. Avoid upper body bending when holding the appliance and
keep the boiler as close to the body as possible.
c)
Lift the boiler and locate onto the wall mounting bracket ensuring the lip on the back of the
boiler cabinet engages fully with the wall bracket.
0. HANDLING INSTRUCTION
The Keston C90 & C110
Quantity
Location
9
Inside accessories bag
9
Inside accessories bag
1
Over the boiler case
2
Inside the boiler case
4
Inside accessories bag
2
Inside accessories bag
2
Over the boiler case
1
Inside the boiler case
Quantity
Location
1
In A4 envelope
1
In A4 envelope
1
In document bag
Page : iii

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C110

Table of Contents