GE 5100 Series Owner's Manual page 11

Zoneline heat pump
Table of Contents

Advertisement

Important electrical safety—read carefully
Important Notes
Installer: Leave these
instructions with the
air conditioner.
Owner: Keep these
instructions for future
use.
Zoneline Components
YOU WILL NEED:
• Universal power
connector kit.
• Phillips screwdriver.
• Follow the National Electrical
Code (NEC) or local codes and
ordinances.
• For personal safety, this Zoneline
must be properly grounded.
• Protective devices (fuses or circuit
breakers) acceptable for Zoneline
installations are specified on the
nameplate of each unit.
Exterior grille/louver**
*Shipped with the Zoneline unit
**Check the "Essential Elements" list on the unit
CAUTION:
• Do not use an extension cord with
this unit.
• Aluminum building wiring may
present special problems—
consult a qualified electrician.
• When the unit is in the STOP
position there is still voltage to
the electrical controls.
• Disconnect the power to the unit
before servicing by:
1 Removing the power cord
(if it has one) from the wall
receptacle.
or—
2 Removing the branch circuit
fuses or turning the circuit
breakers off at the panel.
Wall case**
Zoneline unit
Room cabinet*
Universal power
cord kit**
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zoneline 5100 series

Table of Contents