B) Field Fabricated Line Set Installation - Hoshizaki KMS-1122MLH Instruction Manual

Modular crescent cuber serenity series
Hide thumbs Also See for KMS-1122MLH:
Table of Contents

Advertisement

b) Field Fabricated Line Set Installation

1) Route a 5/8" OD copper tube suction line and a 1/2" OD copper tube liquid line from the
remote condensing unit to the icemaker. Leave a service loop behind the icemaker to
allow the icemaker to be pulled out for service. See Fig. 14.
• Ensure that there are no traps and no kinks in the line set. The service loop is not
considered an oil trap.
• Do not coil extra line set. Fabricate the line set to the proper length.
2) Insulate the two copper tubes separately.
3) Install Parker quick connect couplings on each end. OS-Quick, a universal quick
connect coupling kit available as optional equipment from Hoshizaki America, is
recommended. NOTICE! Before brazing, remove the Schrader valve core from the
access port. When brazing, protect the coupling by using a wet cloth to prevent
the coupling from overheating. Do not use silver alloy or copper alloy containing
arsenic.
4) Allow the coupling to cool, then replace the Schrader valve core.
5) Use an electronic leak detector or soap bubbles to check for leaks. Add a trace of
refrigerant to the to the lines through the Schrader access ports on the Parker quick
connect couplings (if using an electronic leak detector), and then raise the pressure
using nitrogen gas (140 PSIG). WARNING! Do not use R-404A as a mixture with
pressurized air for leak testing.
6) Evacuate through the Schrader access ports on the Parker quick connect couplings and
charge with R-404A refrigerant vapor to a pressure of 15 to 30 PSIG.
7) Connect the refrigerant lines to the appropriate male fittings on the icemaker first and
then at the remote condensing unit. Make a proper connection as follows:
a. Remove the protective covers from the male fitting and female coupling.
b. Apply Polyol Ester (POE) refrigerant oil or Parker Super O Lube to the entire male
fitting, including O-ring, diaphragm, and threads, before making the connection.
See Fig. 9. NOTICE! Do not use thread sealant on the fittings. Use POE
refrigerant oil or Parker Super O Lube only.
c. Make sure the male fitting and female coupling are properly aligned, then start the
connection by hand to ensure that it is not cross threaded.
d. Tighten the connection with a wrench until it is tight. At this point, the nut has
covered most of the threads on the male fitting.
e. Mark a reference line on the female coupling and the remote condensing unit or
icemaker panel. Using a backup wrench on the back of the female coupling, tighten
the six-sided nut of the female coupling an additional 1/6 turn. See Fig. 10.
NOTICE
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk-12hSrk-12h3

Table of Contents