Final Setup-Fill and Initial Heating

1. Turn on the incoming water supply line and inspect both inside and outside of
the unit for leaks in all fittings and tubes.
2. Plug the unit into the appropriate electrical outlet.
3. Turn on the unit's main power switch (located on the back).
Screen one-the FETCO Home Screen will display.
4. Within 6 seconds, the water tank will begin filling until tank probe senses water
Screen two, the "FILLING" will display.
5. Water will cover heating element or when tank water is heating from cold,
Screen three-the "HEATING" Screen will display.
The upper and lower "Touch Function Selector" will not light.
6. After the water has reached the lowest of the four set temperatures, the lower
"Touch Function Selector" will light red color to signal that at least one
temperature range is READY
(
The touch selector buttons will alternately dim and brighten when selection is not active
7. The display will read the four temperature settings as the tank temperature
rises. More detailed operation information follows
8. The upper "Touch Function Selector" will light if one or more temperature level
is available during heating
9. Re- inspect for leaks.

Operating Instructions

1. Turn the main power switch on.
2. Touch the upper "Touch Function Selector", tapping finger to scroll to select
3. When a temperature is enlarged and brightened - that temperature is available.
Touch the lower red selector to dispense hot water.
4. Maximum continuous "ON" is fifteen (15) seconds in a single activating touch
5. Maximum dispense is approximately 20 ounce/600 milliliter.
Approximately three full 15 second batches may be dispensed in succession.
6. Unit returns to inactive "Enabled Screen" if no water is dispensed in 3 seconds
7. Steam and condensation from the water tank is released into the vent
whenever the unit is on. Access the vent barbed fitting located on the upper
back to run gravity drain. For venting to a drain, tubing requirement is ¼" I.D.
(To prevent vacuum backflow, do not place discharge end of vent drain tube
into drain sump)

Operator Training

Review the operating procedures with everyone who will be using the unit.
Pay particular attention to the following areas:
1. Selecting and dispensing water at all four levels
2. How to change temperature settings (See page 7)
3. Scrolling and selecting temperatures and operating the hot water faucet.
Pay particular attention to the safety warnings. (See page 6 & 7)
4. Refer to cleaning procedures and drip tray, listed on the following page.
5. Show the location of the on/off switch, water shut off valve and the utility power
supply circuit breaker for the unit. (See page 3)
DISPENSE
ENABLED
SCREEN
Icon appears after
tank fill and
heating. At least
one temperature
is available for
dispensing
)
Upper Touch
Function Selector
scrolls the menu
selection option
Lower Touch
Function Selector
selects and
activates selected
option
4
The three primary screens for HWD-2105 start up
Home Screen
when power is
turned on.
(Three screens in
"Standby Mode"-
Controls inoperative)
Above-Screen One-FETCO Home Screen
Below-Screen Two-HWD Status Screen
Hot Water Tank is
filling.
Upper and lower
Touch Function
Selectors will
disappear, dim, or
brighten while in
standby or while
filling or heating.
(Controls inoperative)
Hot Water Tank is
heating.
Icon appears from
first fill or during
reheating from an
unheated state or
depleted tank.
(Controls inoperative)
Above-Screen Three-HWD Status Screen

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H210530

Table of Contents