Steam Heated Brewers - Fetco CBS-71A User Manual

Coffee brewing systems installation - operation - service
Hide thumbs Also See for CBS-71A:
Table of Contents

Advertisement

Install a water shut off valve near the brewer to facilitate service. If an in-line water filter is used, it should be
installed after the water shut off valve and in a position to facilitate filter replacement.
Before connecting the water line to the brewer, flush the line and water filter thoroughly to remove any debris.
Connect the water line to the brewer, and turn on the water to check for leaks.
Electrical connection
(Steam heated brewers - see next section)
Verify that the actual voltage at the electrical service connection is compatible with the specifications on the
brewer's serial number plate. Make sure the electrical service includes neutral.
A fused disconnect switch or circuit breaker on the incoming power line must be conveniently located near the
brewer, and its location and markings known to the operators.
The body of the brewer must be grounded to a suitable building ground. A ground lug is provided in the brewer
next to the power terminal block. Use only 10 gauge copper wire for grounding.
Make sure that both power switches are in the "off" position. The buttons should be in the "out" position.
Connect the power, neutral, and ground wires to the terminals in the brewer.
208-240V
208-240V
208-240V
120V
N
L1 L2 L3
TERMINAL BLOCK
Electrical Connection - 240 volts, 3 phase
Turn on the building circuit breaker. Do not turn on the brewer's power switches yet.
At the brewer's terminal block, verify that the correct voltage is between terminals, according to the diagram
above.
CBS-71A - press the power switch. CBS-72A - press only the power switch on the brewer's left side. The power
switch will illuminate. After a delay of 5-6 seconds, the tank should begin filling with water.
CBS-72A - You can press the right side power switch at any time to begin filling the other tank, but this will cause
the first tank to fill more slowly. To fill the first tank as fast as possible, wait until it has filled completely before
pressing the right side power switch.
The heating process will begin after the water has reached a safe level, but before the tank has filled completely.
Approximately 10-15 minutes after the tank has filled, the ready light will illuminate, indicating that this side of the
brewer is at the proper temperature and ready to operate.

Steam Heated Brewers

Electrical connection
The electrical connection is 120 VAC, single phase, 2 wire plus ground. A power cord with a standard 5-15P
plug is provided. The brewer will draw a maximum of 2.5 amps.
Steam connection
The steam line must be clean and free of any debris. A shut off valve should be located near the brewer.
The steam inlet is ½ " or ¾" FPT, and is equipped with a strainer. There are two steam traps with ½ hose barbs.
The steam pressure should be at least 10 PSI, and must not exceed 15 PSI.
A shut off valve should be located near the brewer.
To prevent backups, the ends of the hoses connected to the steam traps must be free (not connected or
submerged).
TO 120V OUTLET
GROUND
WIRE
CORD WITH 5-15P
GROUND
LUG
NEMA PLUG
3
2
1
GROUND
LUG
TERMINAL BLOCKS
Electrical Connection - 480 volts, 3 phase
6
480 V
GROUND
480 V
480 V
L1 L2 L3
GROUND
WIRE
LUG

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbs-72aCbs-71acCbs-72atCbs-72acCbs-72atc

Table of Contents