The Post Installation Check tool verifies that:
– Express5800/320Ma applications are properly installed.
– Correct versions of drivers are properly installed.
– The correct, compiled Managed Object Format (MOF) files are present.
– Express5800/320Ma services are installed and started, except for services
that run only at system startup.
– Third-party applications are properly installed.
– Microsoft hotfixes are installed.
•
The IPL procedure takes approximately two and one-half hours to complete.
Mini-Setup Worksheet
Before you start the IPL or Mini-Setup procedure, record site-specific information on
the worksheet shown in
Mini-Setup prompts.
For more information about the settings listed in
documentation.
Table 6-1. Mini-Setup Worksheet
Setting
Description
Regional
The first Customize button changes general
settings
settings (such as location or language); the
appearance of dates, time, numbers, and
currency; and the input locale (the keyboard's
input language).
The second Customize button changes only the
input locale.
User name
A user name is the name of the person who is
and
performing the installation.
organization
An organization (an optional field) is the
organization to which a copy of Windows is
licensed.
Table
6-1, which lists the information requested by the IPL and
Installing Express5800/320Ma System Software
Mini-Setup Worksheet
Table
6-1, see the Windows
Entry
N/A
User name:
Organization:
6-3