Mounting; Rack Mounting; Figure 3-2 Attaching The Brackets - Edge-Core ES4524M-POE Installation Manual

L2/4 gigabit ethernet switch with power-over-ethernet
Hide thumbs Also See for ES4524M-POE:
Table of Contents

Advertisement

Mounting

An ES4524M-PoE unit can be mounted in a standard 19-inch equipment rack or on
a desktop or shelf. Mounting instructions for each type of site follow.

Rack Mounting

Before rack mounting the switch, pay particular attention to the following factors:
• Temperature: Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range (see page -1).
• Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack assembly is not
overloaded.
• Grounding: Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.
To rack-mount devices:
1.
Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.

Figure 3-2 Attaching the Brackets

3
Mounting
3-3

Advertisement

Table of Contents
loading

Table of Contents