Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment; Figure 3-1 Rj-45 Connections - Edge-Core ES4524M-POE Installation Manual

L2/4 gigabit ethernet switch with power-over-ethernet
Hide thumbs Also See for ES4524M-POE:
Table of Contents

Advertisement

3
Installing the Switch

Equipment Checklist

After unpacking the ES4524M-PoE unit, check the contents to be sure you have
received all the components. Then, before beginning the installation, be sure you
have all other necessary installation equipment.

Package Contents

• ES4524M-PoE unit
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power cord—either US, Continental Europe or UK
• Console cable (RS-232)
• This Installation Guide
• Documentation CD
• Edge-core Warranty Registration Card

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
3-2
RJ-45 Connector

Figure 3-1 RJ-45 Connections

Advertisement

Table of Contents
loading

Table of Contents