Operation Checklist - GE PHP900 Installation Instructions Manual

30" induction cooktop
Hide thumbs Also See for PHP900:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
CHECKLISTS
ITI
PRE-TEST CHECKLIST
[]
Remove all protective
film, if present, and any
stickers.
[]
Check to be sure thGt all wiring is secure and
not pinched or in contact with moving parts.
[]
Check level of GppliGnce,
[]
Check that the cooktop
is properlg grounded.
[_
OPERATION CHECKLIST
[]
[]
[]
[]
[]
Remove all items from the top
of the cooktop surface.
Turn on the power to the cooktop.
(Refer to your Owner's Manual.) Verify that all
surfGce burners operGte properly.
Check that the circuit breaker is not tripped
nor the house fuse blown.
Check that conduit is securelg connected
to
the junction
box.
See Owner's Manual for troubleshooting
list.
NOTE TO ELECTRICIAN:
The power leeds supplied
with this appliance
ere
UL recognized
for connections
to larger gauge
household
wiring. The insulation
of these leeds
is rated at temperatures
much higher than the
temperature
rating
of household
wiring. The
current
carrying
capacity
of a conductor
is
governed
bg the wire gauge end also the
temperature
rating
of the insulation
around
the wire.
NOTE: ALUMINUM
WIRING
WARNING:
IMPROPER CONNECTION OF ALUMINUM
HOUSE WIRING TO THE COPPER LEADS CAN
RESULT IN A SERIOUS PROBLEM.
Splice copper wires to aluminum wiring
using special connectors
designed
end UL
approved
for joining
copper to aluminum
and follow the manufacturer's
recommended
connector
procedure
closely.
NOTE: Wire used, location
end enclosure
of
splices, etc., must conform
to good wiring
practice
end local codes.
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zhu30

Table of Contents