Pre-Test Checklist; Operation Checklist - GE PHP9030 Installation Instructions Manual

Hide thumbs Also See for PHP9030:
Table of Contents

Advertisement

CHECKLISTS

1 PRE-TEST CHECKLIST

A
B
C
D
Installation Instructions
8

2 OPERATION CHECKLIST

A
B
C
D
NOTE TO ELECTRICIAN:
The power leads supplied with this appliance are
UL recognized for connections to larger gauge
household wiring. The insulation of these leads
is rated at temperatures much higher than
the temperature rating of household wiring.
The current carrying capacity of a conductor
is governed by the wire gauge and also the
temperature rating of the insulation around
the wire.
NOTE: ALUMINUM WIRING
• WARNING:
IMPROPER CONNECTION OF ALUMINUM
HOUSE WIRING TO THE COPPER LEADS CAN
RESULT IN A SERIOUS PROBLEM.
• Splice copper wires to aluminum wiring
using special connectors designed and UL
approved for joining copper to aluminum
and follow the manufacturer's recommended
connector procedure closely.
NOTE: Wire used, location and enclosure of
splices, etc., must conform to good wiring
practice and local codes.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents