Installation (Vcih Island Hoods) - Viking VBCV36381 Installation Instructions Manual

Professional & outdoor hoods
Hide thumbs Also See for VBCV36381:
Table of Contents

Advertisement

Installation
(VCIH Island Hoods)
Run duct work down to bottom edge of duct
Attach canopy to duct cover/soffit. Seal top of hood to
Check framing where cutout will be.
Cut appropriate size hole in ceiling. Either 7" or 10"
cover/soffit and secure in place. Make sure the duct
duct with aluminum tape.
NOTE: 200 lb. limit.
depending on your specific unit and ventillator kit.
does not stick down past the cover.
Slide filter front over front lip. Push filter rear up, then
Attach duct cover to optional ceiling mounting bracket.
slide back over rear lip.
Slide spacer front over front lip. Push spacer rear up,
Slide filter front over front lip. Push filter rear up, then
Attach duct cover to ceiling. The ceiling bracket can be
Additional support option. Drill holes in all four corners
then slide back over rear lip. NOTE: Number of spacers
slide back over rear lip.
hidden by using a locally supplied trim.
for threaded rod and run rods from hood to ceiling.
and baffles may vary by model.
40
41

Advertisement

Table of Contents
loading

Table of Contents