Installation; Hardware Installation - Fujitsu MB91360 User Manual

Mb91360 series starterkit
Hide thumbs Also See for MB91360:
Table of Contents

Advertisement

2 Installation

2.1 Hardware Installation

What you'll need :
Host : IBM(-comp) PC with Windows 9x or Windows NT ; 1 COM-port
<
Power Requirements: A power supply, capable of supporting 9-12V DC at about 500
<
mA. Note that the power connector must be + at the shield and - in the centre. Power
supplies are available from Fujitsu.
RS232 : An 'extension' (1:1) RS232 cable with DB9 m+f connectors
<
Connect the power-supply (9-12V DC-input) and the RS232-cable
and switch on the Starterkit.
LED D10 should light up (power-indicator)
and LED D11 flashing (reset indicator).
During the initialization phase
the red monitor LED is on.
After that, a start message from the monitor
("91360-STARTERKIT MONITOR VxLx")
will be displayed on the LCD and the green user LED will light up.
The board is now ready to use.
© Fujitsu Microelectronics Europe GmbH
STARTERKIT MB91360
Chapter 2 Installation
- 9 -
UG-910006-13

Advertisement

Table of Contents
loading

Table of Contents