This chapter describes requirements and procedures to install your S25P system, in the following topics:

Site Selection

Cabinet Placement on page 14
Rack Mounting on page 14
Fans and Airflow on page 14
Power on page 15
Storing Components on page 15
Tools Required on page 16
For detailed S25P specifications, refer to
Note: Install the S25P into a rack or cabinet before installing any optional components.
Site Selection
Make sure that the area where you install your S25P chassis meets the following safety requirements:
Near an adequate power source. Connect the system to the appropriate branch circuit protection as
defined by your local electrical codes.
Ambient temperature between 32° – 122°F (0° – 40°C).
Relative humidity that does not exceed 85% non-condensing.
In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot
air vents or direct sunlight.
Away from sources of severe electromagnetic noise.
Positioned in a rack, cabinet, or on a desktop with adequate space in the front, rear, and sides of the
unit for proper ventilation, and access.
Installing the S25P System

Site Preparation

Chapter 5, S25P Specifications, on page
33.
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Force10 s25p

Table of Contents