Dell Force10 S25-01-GE-24P Manual page 23

Installing the s25p system
Hide thumbs Also See for Force10 S25-01-GE-24P:
Table of Contents

Advertisement

Step
Task
4
Position the cage nuts over the holes on each bracket flange and each rack post.
Figure 12 Four-Post Rack-mounting with Cage Nuts
5
Align the rack filler panel to the rear bracket and rack posts. Secure by inserting two screws into the hole in the
filler panel through to the holes in the rack post.
Figure 13 Four-Post Rack-mounting with Cage Nuts
Installing the S25P System
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Force10 s25p

Table of Contents