Four-Post Rack-Mounting With Cage Nuts - Dell Force10 S25-01-GE-24P Manual

Installing the s25p system
Hide thumbs Also See for Force10 S25-01-GE-24P:
Table of Contents

Advertisement

Four-Post Rack-mounting with Cage Nuts

Ensure that there is adequate clearance surrounding the cabinet or rack to permit access and airflow. If you
are installing two S25P systems side-by-side, position them at least 5 inches (12.7 cm) apart. Follow the
steps below to install the S25P chassis into a four-post rack mounting with cage nuts.
Step
Task
Attach the two rear brackets to the side panels. Align the three holes in the bracket with the three holes on the
1
S25P chassis, and secure the brackets to the chassis using the screws.
Figure 10 Four-Post Rack-mounting with Cage Nuts
2
Align and secure the adjustable bracket onto the rear bracket.
3
Insert the S25P chassis into the rear of the rack. Position and secure the chassis with two screws into each front
bracket flange and into the rack post.
Figure 11 Four-Post Rack-mounting with Cage Nuts
22
Top View of Brackets
Align brackets
Installing the S25P

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Force10 s25p

Table of Contents