3.10.1 Scheduling Synchronization

To schedule routine synchronization, follow the procedure below:
1. Click the Logical Drive View icon in the Tree View.
2. Click the Synchronization Schedule tab in the Management Window.
The following message is registered when you first
perform synchronization to the logical drive that has
been created without initialization.
Synchronization is requested to perform
on the logical drive "LD-name" that has
never been initialized.
This does not have any influences on synchronization
processing.
At the end of synchronization, always check the event
log to see if any error occurs during synchronization.
If a media error occurs, a message indicating the
occurrence of the error appears before the message
indicating that the synchronization has finished
successfully.
If a synchronization task has been scheduled, a rebuild
task starts, and the scheduled time comes during the
rebuild, the synchronization is skipped (not executed)
for that time.
If a synchronization task has been scheduled, and if
the scheduled time comes while another
synchronization task is being performed, the
scheduled synchronization is skipped (not executed)
for that time.
If a synchronization task has been scheduled, and if
the scheduled time comes while the power is off, the
synchronization task will start after the power is
turned on.
-
-