Preparation Before Connecting Your Switch - NetComm NP3005 User Manual

5-port 1000base-t gigabit etnernet switch
Hide thumbs Also See for NP3005:
Table of Contents

Advertisement

Preparation before connecting your switch

Before you install your switch, make sure you will be operating the unit within the specified
voltage and temperature limits. To install your switch on a flat surface, simply adhere the
included rubber feet within the outlines on the bottom surface of the unit. Ensure the switch is
positioned with at least 50mm of space on all sides for adequate ventilation.
To install the switch on a wall, measure the distance between the mounting holes on the back of
the switch and mark the wall to match the measured distance. At the marked location, screw into
the wall two suitably sized screws.
Choose a location that is near the devices to be connected, is close to a suitable electrical outlet,
and provides at least 50mm of space all around the switch for ventilation.
Rev.1 - YML671
NP3005 - 5 Port Gigabit Switch
www.netcomm.com.au
Page 13

Advertisement

Table of Contents
loading

Table of Contents