Netra
1290 Server Installation
Guide
Sun Microsystems, Inc.
www.sun.com
Part No. 819-4372-10
May 2006, Revision A
Submit comments about this document at: http://www.sun.com/hwdocs/feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Netra 1290 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sun Microsystems Netra 1290

  • Page 1 Netra 1290 Server Installation ™ Guide Sun Microsystems, Inc. www.sun.com Part No. 819-4372-10 May 2006, Revision A Submit comments about this document at: http://www.sun.com/hwdocs/feedback...
  • Page 2 Products bearing SPARC trademarks are based upon an architecture developed by Sun Microsystems, Inc. The OPEN LOOK and Sun™ Graphical User Interface was developed by Sun Microsystems, Inc. for its users and licensees. Sun acknowledges the pioneering efforts of Xerox in researching and developing the concept of visual or graphical user interfaces for the computer industry. Sun holds a non-exclusive license from Xerox to the Xerox Graphical User Interface, which license also covers Sun’s licensees who implement OPEN...
  • Page 3: Table Of Contents

    Contents Preface ix Unpacking and Installing the Server 1 Unpacking the Server 1 Installing Slide Rails 4 Adjusting the Slide Rail Assembly 5 Installing the Slide Rail Assemblies in a Sun Fire or Sun StorEdge Cabinet 9 To Install the Slide Rail Assemblies in the Bottom Position 9 To Install the Slide Rail Assemblies in the Top Position 10 Installing the Slide Rail Assemblies in a Sun Rack 900 Cabinet 11 To Install the Slide Rail Assemblies in the Bottom Position 11...
  • Page 4 10/100BASE-T LOM Ethernet Port 58 Twisted-Pair Ethernet Cable-Type Connectivity 59 LOM Serial A and Serial B Ports 59 Using a DB-25 Adapter for Your Serial Link 61 Using a DB-9 Adapter for Your Serial Link 61 Netra 1290 Server Installation Guide • May 2006...
  • Page 5 Figures Opening the Shipping Carton 2 FIGURE 1-1 Removing the Carton Pieces 3 FIGURE 1-2 Slide Rail Assembly (Standard Configuration) 5 FIGURE 1-3 Spring Clips and Cutouts 7 FIGURE 1-4 Slide Rail Assembly–Modified for 2-Post Installation 8 FIGURE 1-5 Installing the Slide Rails in a Sun Fire Cabinet 10 FIGURE 1-6 Installing the Rails in a Sun Rack 900 Cabinet or 19-Inch Four-Post Cabinet 12 FIGURE 1-7...
  • Page 6 68-Pin SCSI Connector 55 FIGURE A-2 DB-15 (Male) Alarms Service Port Connector 56 FIGURE A-3 RJ-45 Gigabit Ethernet Connectors 58 FIGURE A-4 RJ-45 TPE Socket 58 FIGURE A-5 RJ-45 Serial Connectors 60 FIGURE A-6 Netra 1290 Server Installation Guide • May 2006...
  • Page 7 Tables 68-Pin SCSI Connector Pinout 55 TABLE A-1 68-Pin SCSI Connector Pinout (continued) 56 TABLE A-2 Alarms Service Port Connector Pinout 57 TABLE A-3 RJ-45 Gigabit Ethernet Connector Pinout 58 TABLE A-4 Twisted-pair Ethernet Connector Pinout 59 TABLE A-5 TPE STP-5 Cable Lengths 59 TABLE A-6 RJ-45 Serial Connector Pinout 60 TABLE A-7...
  • Page 8 Netra 1290 Server Installation Guide • May 2006...
  • Page 9: Preface

    Preface The Netra 1290 Server Installation Guide provides detailed procedures that describe the installation, power-on, and configuration of the Netra™ 1290 server into a rack. This document is written for technicians, system administrators, authorized service providers (ASPs), and users who have experience installing and configuring computer hardware.
  • Page 10: Typographic Conventions

    Replace command-line variables You must be superuser to do this. with real names or values. To delete a file, type rm filename. * The settings on your browser might differ from these settings. x Netra 1290 Server Installation Guide • May 2006...
  • Page 11: Related Documentation

    Related Documentation The documents listed as online are available at: http://www.sun.com/products-n-solutions/hardware/docs/ Application Title Part Number Format Location Pointer doc Netra 1290 Server Getting Started Guide 819-4378-10 Printed Shipping kit Online Service Netra 1290 Server Service Manual 819-4373-10 Online Administration Netra 1290 Server System Administration...
  • Page 12: Sun Welcomes Your Comments

    You can submit your comments by going to: http://www.sun.com/hwdocs/feedback Please include the title and part number of your document with your feedback: Netra 1290 Server Installation Guide, part number 819-4372-10 xii Netra 1290 Server Installation Guide • May 2006...
  • Page 13: Unpacking And Installing The Server

    C H A P T E R Unpacking and Installing the Server This chapter describes unpacking and installing the Netra 1290 server into a rack. Topics include: “Unpacking the Server” on page 1 “Installing Slide Rails” on page 4 “Installing the Server in a Cabinet” on page 15 “Installing Slide Rail Lock Nuts”...
  • Page 14: Figure 1-1 Opening The Shipping Carton

    Carton protection pads Bands Opening the Shipping Carton FIGURE 1-1 4. Cut the bands from the outer packaging and open the carton. FIGURE 1-1 5. Remove and unpack the shipping kit. FIGURE 1-2 Netra 1290 Server Installation Guide • May 2006...
  • Page 15: Figure 1-2 Removing The Carton Pieces

    Shipping kit Outer carton Internal saddle Removing the Carton Pieces FIGURE 1-2 6. Remove the outer carton. FIGURE 1-2 Chapter 1 Unpacking and Installing the Server...
  • Page 16: Installing Slide Rails

    (130 kg). Two people using a computer equipment lift are required to move the server safely into the cabinet. Caution – Pull only one Netra 1290 server out of the cabinet at a time to prevent unbalancing the cabinet.
  • Page 17: Adjusting The Slide Rail Assembly

    This section is divided into the following: “Adjusting the Slide Rail Assembly” on page 5 “To Install the Inner Rails on the Server” on page 6 “To Prepare the Rails for 2-Post Installations” on page 8 “Installing the Slide Rail Assemblies in a Sun Fire or Sun StorEdge Cabinet” on page 9 “Installing the Slide Rail Assemblies in a Sun Rack 900 Cabinet”...
  • Page 18: To Install The Inner Rails On The Server

    Pull the inner rail free from the outer slide rail assembly. 2. Push up on the inner rail so that the locating tab, on the side of the server, clips over the cutouts in the rail ( FIGURE 1-4 Netra 1290 Server Installation Guide • May 2006...
  • Page 19: Figure 1-4 Spring Clips And Cutouts

    Spring Clips and Cutouts FIGURE 1-4 The spring clip should engage. Note – The spring clips must be above the system hooks. The lip on the main body of the inner rail must engage under and behind the system hook. 3.
  • Page 20: Figure 1-5 Slide Rail Assembly-Modified For 2-Post Installation

    6. Align the rear bracket to the appropriate markings on the slide rail assembly and secure the rear bracket. 7. Repeat Step 1 through Step 6 for the second slide rail assembly. Netra 1290 Server Installation Guide • May 2006...
  • Page 21: Installing The Slide Rail Assemblies In A Sun Fire Or Sun Storedge Cabinet

    Installing the Slide Rail Assemblies in a Sun Fire or Sun StorEdge Cabinet Sun Fire™ and Sun StorEdge™ cabinets have No. 10-32 UNF tapped screw holes in the front and rear, which are numbered from bottom to top. Note – The slide rail assemblies are reversible. They can be used on either side of the cabinet.
  • Page 22: To Install The Slide Rail Assemblies In The Top Position

    Loosen the two nuts that secure the adjustable bracket. b. Reposition the adjustable bracket to the location stamped “SUNFIRE” on the rear bracket and secure the adjustable bracket. 2. Adjust the length of each slide rail assembly. Netra 1290 Server Installation Guide • May 2006...
  • Page 23: Installing The Slide Rail Assemblies In A Sun Rack 900 Cabinet

    a. Loosen the four nuts that secure the rear bracket. b. Reposition the rear bracket to the location marked “Sun Fire Cabinet” on the slide rail assembly and secure the rear bracket. 3. Insert the pins in the front bracket into cabinet holes 58 and 69 ( FIGURE 1-6 The pins hold the bracket in place until it is secured.
  • Page 24: Figure 1-7 Installing The Rails In A Sun Rack 900 Cabinet Or 19-Inch Four-Post Cabinet

    Step 5 for the second slide rail assembly. Note – Mounting the server in cabinet holes 24 and 31 allows for 10-inches of space beneath the server in order to service the backplane. Netra 1290 Server Installation Guide • May 2006...
  • Page 25: To Install The Slide Rail Assemblies In The Top Position

    To Install the Slide Rail Assemblies in the Top Position 1. Remove the adjustable bracket on each rail. a. Loosen the two nuts that secure the adjustable bracket. b. Discard the adjustable bracket. 2. Adjust the length of each slide rail assembly. a.
  • Page 26: Installing The Slide Rail Assemblies In A 19-Inch 2-Post Rack

    Caution – Ensure that the rack is anchored to the floor, ceiling, or adjacent frames. It is the installer’s responsibility to ensure that the rack has sufficient structural strength and stability to handle any required installations. Netra 1290 Server Installation Guide • May 2006...
  • Page 27: To Install The Slide Rail Assemblies In A 19-Inch 2-Post Rack

    To Install the Slide Rail Assemblies in a 19-Inch 2-Post Rack 1. Secure the front bracket with two No. 10-32 UNF screws. Insert the rackmount securing screws no lower than 18.5 inches and 22.5 inches (47.0 cm and 57.2 cm) respectively. Note –...
  • Page 28: Figure 1-8 Releasing The Door Hinge Mechanism

    Releasing the Door Hinge Mechanism FIGURE 1-8 2. Remove the shipping cradle bolts ( FIGURE 1-9 The bolts secure the orange metal shipping cradle to the wooden pallet. Netra 1290 Server Installation Guide • May 2006...
  • Page 29: Figure 1-9 Removing The Shipping Cradle Bolts

    FIGURE 1-9 To Mount the Server in the Cabinet Caution – The Netra 1290 server with shipping cradle weighs approximately 286.0 lb (130.0 kg). To prevent personal injury, two people are needed to move the server safely into the cabinet using a computer equipment lift.
  • Page 30: Figure 1-10 Inserting The Lifting Device Into The Shipping Cradle

    6. Carefully move the lifting device forward until the rails on the server are fully engaged with the outer rails on the cabinet FIGURE 1-11 The latches on each side must click out, locking the rails. Netra 1290 Server Installation Guide • May 2006...
  • Page 31: Figure 1-11 Aligning The Rails

    Outer rails Inner rails Aligning the Rails FIGURE 1-11 Chapter 1 Unpacking and Installing the Server...
  • Page 32: Figure 1-12 Removing The Shipping Cradle

    This disconnects the shipping cradle from the server. 10. Lower the shipping cradle out of the way with the lifting device ( FIGURE 1-12 Store the shipping cradle for future use. Removing the Shipping Cradle FIGURE 1-12 Netra 1290 Server Installation Guide • May 2006...
  • Page 33: Figure 1-13 Pushing The Server Into The System Cabinet

    11. Press the green latches on each rail and push the server into the cabinet FIGURE 1-13 Pushing the Server Into the System Cabinet FIGURE 1-13 12. Tighten the two securing screws on the front of the server to secure the server in the cabinet ( FIGURE 1-14 Securing screw...
  • Page 34: Installing Slide Rail Lock Nuts

    3. Remove and discard the manufacturers spacers provided with the rails in the kit. 4. From the rear of the server, insert and tighten the Sun supplied spacers onto the studs on each rail ( FIGURE 1-15 The spacer shoulders must face outwards. Netra 1290 Server Installation Guide • May 2006...
  • Page 35: Figure 1-15 Inserting And Tightening The Spacers

    Inserting and Tightening the Spacers FIGURE 1-15 5. Slide the server into the system cabinet. 6. From the rear of the server, insert and tighten the lock nuts, one for each rail FIGURE 1-16 Inserting and Tightening the Lock Nut FIGURE 1-16 7.
  • Page 36: Installing The Cable Management Arm

    PCI 3 PCI 4 PCI 5 33MHz 33MHz 33MHz 33MHz 33MHz 66MHz SSC1 SSC1 Serial A Serial B Link Active GBit Link Active GBit Lower bracket holes CMA Bracket Mounting Holes FIGURE 1-17 Netra 1290 Server Installation Guide • May 2006...
  • Page 37: Figure 1-18 Cma-Lite Cable Management Arm

    To Install the CMA–Lite 1. Secure the pivot at the end of the upper arm to the top rear of the server, using the two captive screws ( FIGURE 1-18 2. Secure the center pivot point of the CMA to the inside rear of the left hand slide rail assembly, using the two captive screws.
  • Page 38: Figure 1-19 Upper And Lower Cma Arms, And Left-Hand And Right-Hand T-Brackets

    Upper and Lower CMA Arms, and Left-Hand and Right-Hand T-Brackets FIGURE 1-19 Note – In the following procedure all left-hand and right-hand orientation is as viewed from the rear of the server chassis. Netra 1290 Server Installation Guide • May 2006...
  • Page 39: Figure 1-20 Upper And Lower Pivot Bracket Mounting Holes

    1. Remove the hinge pin securing the pivot bracket to the upper CMA arm, which facilitates attaching the bracket to the server chassis. 2. Secure the pivot bracket to the upper left-hand side of the server chassis using the two captive screws. See FIGURE 1-20 FIGURE 1-21 Upper pivot bracket...
  • Page 40: Figure 1-21 Attaching The Upper Cma Arm And Pivot Bracket

    3. Remove the hinge pin securing the pivot bracket to the lower CMA arm, which facilitates attaching the bracket to the server chassis. 4. Secure the pivot bracket to the lower left-hand of the server chassis using the two captive screws. See FIGURE 1-20 FIGURE 1-22 Netra 1290 Server Installation Guide • May 2006...
  • Page 41: Figure 1-22 Attaching The Lower Cma Arm And Pivot Bracket

    Hinge pin Lower pivot bracket Lower CMA arm Attaching the Lower CMA Arm and Pivot Bracket FIGURE 1-22 5. After attaching the bracket to the chassis, secure the lower CMA arm to the bracket using the hinge pin removed previously. 6.
  • Page 42: Figure 1-23 Attaching The Left-Hand T-Bracket

    Slide rail Left hand T-bracket Attaching the Left-Hand T-Bracket FIGURE 1-23 7. Secure the right-hand T-bracket to the right-hand slide rail using two captive screws ( FIGURE 1-24 Netra 1290 Server Installation Guide • May 2006...
  • Page 43: Figure 1-24 Attaching The Right-Hand T-Bracket

    Slide rail Right hand T-bracket Attaching the Right-Hand T-Bracket FIGURE 1-24 8. Secure the upper CMA arm to the left-hand T-bracket using a single hinge pin FIGURE 1-25 Chapter 1 Unpacking and Installing the Server...
  • Page 44: Figure 1-25 Attaching The Upper And Lower Cma Arms To The T-Bracket

    10. Route the cabling through the cable channels as desired. 11. Secure both the upper and lower CMA arms by inserting the guide bars of each arm into the slots provided on the right-hand T-bracket. Netra 1290 Server Installation Guide • May 2006...
  • Page 45: Connecting Power Cables

    Connecting Power Cables Caution – The Netra 1290 server is designed to work with power systems having a grounded neutral conductor. Do not connect the equipment into any other type of power system. Contact your facilities manager or a qualified electrician to determine what type of power is supplied to your building.
  • Page 46: Connecting Consoles To The System Controller

    A or the 10/100BASE-T LOM Ethernet port. The administrative console can be any external input device (laptop computer or workstation) connected to either of these ports. Netra 1290 Server Installation Guide • May 2006...
  • Page 47 2. Turn the customer-supplied circuit breakers power switch to the On position. 3. Turn the system power switch to the On position. Refer to the Netra 1290 Server System Administration Guide, 819-4374. 4. Set up the system console. Refer to the Netra 1290 Server System Administration Guide, 819-4374.
  • Page 48: Figure 1-26 System Controller And I/O Assembly Locations

    10/100BASE-T LOM Ethernet port. Note – Communication on the LOM Serial A port is possible but is subject to interruption by the LOM device. Refer to the Netra 1290 Server System Administration Guide, 819-4374.
  • Page 49: Connecting The I/O Assemblies

    Caution – For optimum performance, use only I/O cards and associated drivers that are qualified by Sun Microsystems for use on the Netra 1290 server. It is possible for interactions to occur between cards and drivers on a specific bus that might lead to potential system panics or other negative outcomes if the card/driver solution is not qualified by Sun Microsystems.
  • Page 50: Installing Additional Peripheral Devices

    When you add additional storage devices, refer to the Rackmount Placement Matrix, at http://docs.sun.com, for the mounting hole numbers of the mounting screws for Sun Microsystems disk arrays, other storage trays, and devices. Unless otherwise specified in the Rackmount Placement Matrix, mount the heaviest subassemblies at the lowest available opening.
  • Page 51: Setting Up

    C H A P T E R Setting Up This chapter describes how to power on your server using the system controller command-line interface (LOM prompt), how to set up the SC using the setupnetwork command, and how to boot the Solaris Operating System. This chapter contains the following topics: “Setup Process”...
  • Page 52: Setting Up The Hardware

    8. Booting the Solaris Operating System. 9. Installing the Lights Out Management packages from the Sun Microsystems software download center. Setting Up the Hardware To Install and Cable the Hardware 1. Connect a terminal to the system controller board serial port ( FIGURE 1-26 2.
  • Page 53: Disabling Operation Of The On/Standby Switch

    Operating the On/Standby switch Sending the poweron command via the LOM port The On/Standby switch of the Netra 1290 server controls only low voltage signals and no high voltage circuits pass through it. Note – The power switch is not an On/Off switch, it is an On/Standby switch. It does not isolate the equipment.
  • Page 54: Bringing The Server To Standby Mode

    When the system powers off to Standby mode, the Source A and Source B indicators are the only indicator LEDs to be illuminated on the system indicator board. The IB_SSC assembly Active LED is lit, but not visible from the front of the server. Netra 1290 Server Installation Guide • May 2006...
  • Page 55 To Bring the System to Standby Mode From the Solaris Command Line At the system prompt, type: # shutdown -i5 To Bring the System to Standby Mode From the LOM Port At the lom> prompt, type: lom>shutdown For an abrupt power off, type: lom>poweroff This will abruptly terminate Solaris.
  • Page 56: Setting Up The Server

    For more information on the setdate command, see the Sun Fire Entry-Level Midrange System Controller Command Reference Manual, 819-1268. To Set Up the Password 1. At the LOM prompt, type the SC password command. Netra 1290 Server Installation Guide • May 2006...
  • Page 57 If your password has been lost or forgotten, contact Sun Service for assistance. To Configure Network Parameters The Netra 1290 server can be administered from the SC LOM prompt and from the Solaris software. There are two ways to access the LOM console connection:...
  • Page 58: Installing And Booting The Solaris Operating System

    To Install and Boot the Solaris Operating System 1. Access the LOM prompt. For detailed instructions on how you can access the LOM prompt, see the Netra 1290 Server System Administration Guide, 819-4374. Netra 1290 Server Installation Guide • May 2006...
  • Page 59: Installing The Lights Out Management Packages

    After the Solaris Operating System is booted, the login: prompt is displayed. login: Installing the Lights Out Management Packages Three LOM packages needed for a Netra 1290 server: SUNWlomu (LOMlite Utilities (usr)) SUNWlomm (LOMlite manual pages) SUNWlomr (LOM drivers) Chapter 2 Setting Up...
  • Page 60 Note – The latest patches to these packages is available from SunSolve in patch 110208. It is strongly advised that the latest version of patch 110208 be obtained from SunSolve and be installed on the Netra 1290 server to make use of the latest LOM utility updates.
  • Page 61 Installing the LOM Drivers (Continued) CODE EXAMPLE 2-2 i.drivers (INFO): Installing /var/tmp/SUNWlomr/reloc/platform/sun4u/kernel/drv/sparcv9/lomv i.drivers (INFO): Identified drivers ’lom lomp lomv’ i.drivers (INFO): Cleaning up old driver ’lom’... Cleaning up old devlink entry ’type=ddi_pseudo;name=SUNW,lom lom’ i.drivers (INFO): Cleaning up old driver ’lomp’... Cleaning up old devlink entry ’type=ddi_pseudo;name=lomp lomp’...
  • Page 62 Note – The warning messages concerning lomp, lomv, and lom driver attachment seen during the installation of the SUWNlomr package can be safely ignored since the SUNWlomr package is not used on the Netra 1290 server. However, the presence of the package is required to enable successful upgrade through future patches.
  • Page 63 # pkgadd -d . SUNWlomm Processing package instance <SUNWlomm> from </export/lom> LOMlite manual pages (sparc) 2.0,REV=2000.08.22.14.14 Copyright 2000 Sun Microsystems, Inc. All rights reserved. Using </> as the package base directory. ## Processing package information. ## Processing system information. 5 package pathnames are already properly installed.
  • Page 64 Netra 1290 Server Installation Guide • May 2006...
  • Page 65: Netra 1290 Server Connections

    “NET0/NET1 Ethernet Ports” on page 57 “10/100BASE-T LOM Ethernet Port” on page 58 “LOM Serial A and Serial B Ports” on page 59 External I/O Connection Locations shows the location of external I/O connections of the Netra 1290 server. FIGURE A-1...
  • Page 66: Pci+ Ib_Ssc Assemblies

    0 is on the left and slot 5 is on the right. All six slots support up to 66 MHz. The PCI+ slots are not hot-swappable, all slots are half length and 5V signaling is not supported. Netra 1290 Server Installation Guide • May 2006...
  • Page 67: Scsi Connector

    +I/O Reserved +DB(2) +DB(8) Ground +DB(3) +DB(9) –ATN +DB(4) +DB(10) Ground +DB(5) +DB(11) –BSY +DB(6) –DB(12) –ACK +DB(7) –DB(13) –RST +DB(P0) –DB(14) –MSG Ground –DB(15) –SEL Diffusion ANAL –DB(P1) –C/D Termpwr POWER –DB(0) –REQ Appendix A Netra 1290 Server Connections...
  • Page 68: Scsi Implementation

    Maximum cable length support is 33 ft. (10 meters). Alarms Port The alarms service port is a male DB-15 ( lists the pinout FIGURE A-3 TABLE A-3 information. ALARMS DB-15 (Male) Alarms Service Port Connector FIGURE A-3 Netra 1290 Server Installation Guide • May 2006...
  • Page 69: Net0/Net1 Ethernet Ports

    NET0/NET1 Ethernet Ports The NET0/NET1 Ethernet ports are shielded RJ-45 connectors ( ). The FIGURE A-4 NET0/NET1 Ethernet ports are also known as the Gigabit Ethernet RJ-45 ports. lists the pinout information. TABLE A-4 Appendix A Netra 1290 Server Connections...
  • Page 70: 10/100Base-T Lom Ethernet Port

    The 10/100BASE-T LOM Ethernet port is an RJ-45 twisted-pair Ethernet (TPE) connector ( ). This port is also known as the system controller Ethernet FIGURE A-5 port. lists the pinout information. TABLE A-5 SSC1 RJ-45 TPE Socket FIGURE A-5 Netra 1290 Server Installation Guide • May 2006...
  • Page 71: Twisted-Pair Ethernet Cable-Type Connectivity

    The LOM Serial A and serial B ports use RJ-45 connectors ( ). The LOM FIGURE A-6 Serial A port is also known as the system controller serial port. lists the TABLE A-7 pinout information identical for both serial ports. Appendix A Netra 1290 Server Connections...
  • Page 72: Rj-45 Serial Connectors

    Be sure to check the manufacturer’s documentation for your specific terminal server. Communication on LOM Serial A is subject to interruption by the LOM device. Refer to the Netra 1290 Server System Administration Guide, 819-4374.
  • Page 73: Using A Db-25 Adapter For Your Serial Link

    Pin 2 (RXD) Pin 4 (Signal Ground) Pin5 (Signal Ground) Pin 5 (Signal Ground) Pin 5 (Signal Ground) Pin 6 (RXD) Pin 3 (TXD) Pin 7 (DSR) Pin 4 (DTR) Pin 8 (CTS) Pin 7 (RTS) Appendix A Netra 1290 Server Connections...
  • Page 74 Netra 1290 Server Installation Guide • May 2006...
  • Page 75 Index connectivity, 59 adjusting slide rails, 5 administrative console, 35 date and time, setting, 44 alarm connector, 56 Ethernet cable lengths, 59 cable lengths, 59 cable management arm connection, 57 CMA-800, installing, 26 TPE connectivity, 59 CMA-Lite, installing, 25 installing, 24 command password, 44 connector locations, 53...
  • Page 76 LOM command, 42 On/Standby switch, 41 poweroff command, 43 poweron command, 42 preparing installing server into cabinet, 15 slide rails, 8 SCSI connector, 55 implementation, 56 setdate command, 44 setting up, 39 Netra 1290 Server Installation Guide • May 2006...