Teledyne 4220 Installation And Operation Manual page 60

Submerged probe flow meter
Table of Contents

Advertisement

4220 Flow Meter
Section 2 Programming
2-32
If you select ROUND PIPE for the Manning flow conversion, the
following displays will appear:
MANNING ROUND PIPE
SLOPE = X.XXXXX ROUGH = X.XXXX
Slope is entered as a dimensionless quantity, delta Y/ delta X, not
as percent slope. Or, as otherwise expressed:
Δ
X
=
ΔY
For
1
example:
100
Roughness coefficients are published in the Isco Open Channel
Flow Measurement Handbook. You must know the material the
pipe is made of. The roughness coefficients are published for all
common materials in three grades: minimum, normal and
maximum. Then:
MANNING ROUND PIPE
DIAMETER = X.XXX FEET (or meters)
If you select U-CHANNEL for the Manning flow conversion, the
following displays will appear:
MANNING U-CHANNEL
SLOPE = X.XXXXX ROUGH = X.XXX
(
Slope and roughness are entered as for ROUND PIPE previ-
ously.) Then:
MANNING U-CHANNEL
WIDTH = X.XXX FEET (or meters)
If you select RECTANGULAR for the Manning flow conversion,
the following displays will appear:
MANNING RECTANGULAR
SLOPE=X.XXXXX ROUGH=X.XXX
(Slope and roughness are entered the same as for ROUND PIPE
previously.) Then:
MANNING RECTANGULAR
WIDTH=X.XXX FEET (or meters)
Rise
Run
= .01

Advertisement

Table of Contents
loading

Table of Contents