Enabling And Disabling Synchronization Links - HP Quality Center Synchronizer 1.2 User Manual

Table of Contents

Advertisement

Chapter 4 • Working with Quality Center Synchronizer

Enabling and Disabling Synchronization Links

Each synchronization link can be in one of the following states:
Unvalidated, Disabled, and Enabled. The following table lists these states
and their descriptions. It also lists under what circumstances the link moves
between states.
State
Unvalidated
Disabled
Enabled
To enable a synchronization link:
1
In the Links list or Links Grid, select the link you want to enable.
2
Make sure that the link is in the state Disabled. If the link is in the state
Unvalidated, you must run an integrity check to change its state to
Disabled. For more information on running integrity checks, see "Running
Link Tasks Manually" on page 91.
3
Click the Enable Link button or choose Link > Enable.
102
Description
When State Entered
The link's
Upon creation of a
configuration
new link or
has not been
modification of the
verified. You
configuration of an
cannot run tasks
existing link.
for the link.
The link's
Upon successful
configuration
completion of an
has been
integrity check, or
verified, but you
manually from
cannot run tasks
status Enabled.
on the link.
The link's
Manually from
configuration
status Disabled.
has been
validated, and
you can run
tasks on the
link.
When State Left
Upon execution of an
integrity check. For
more information on
running integrity
checks, see "Running
Link Tasks Manually"
on page 91.
Manually to status
Enabled, or after
modification of link
configuration to status
Unvalidated.
Manually to status
Disabled, or after
modification of link
configuration to status
Unvalidated.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quality center synchronizer 1.20

Table of Contents