Commissioning Of Hydraulic Station - Baxi MULTIFIT Evacuated Tube Collector Kit Instructions

Evacuated tube collector 10 tube additional pitched roof kit
Hide thumbs Also See for MULTIFIT Evacuated Tube Collector:
Table of Contents

Advertisement

Fig. 37
2
Table 1
Flow rate
(when system is cold)
Collectors
l/min
20
approx. 4
30
approx. 6
Fig. 38
28
© Baxi Heating UK Ltd 2011
5
3
4
1
2
13.0
13.1
Checking and adjusting the flow rate
1
1. Adjust the flow rate when the system is cold (20°C)
(see Fig. 37).
2. The flow rate should be adjusted to give the optimum flow
rate depending on the number and type of collector(s)
connected.
3. Manually operate the solar pump (See Section 14.6).
4. Set the solar pump speed selector (Fig. 37 item 5) so that
the required flow rate is achieved or exceeded with the
lowest possible setting. The flow limiter adjusting screw (Fig. 37
item 3) can be used to fine-tune the flow rate.
5. Depending on the number and type of collectors installed,
set the required flow rate from table (See Table 1).
6. The float in the flow meter will indicate the circulation flow
rate through the flow meter sight glass (Fig. 37 item 4).
7. Adjust screw of the flow limiter (Fig. 37 item 3) with a
screwdriver, until the upper edge of the float in the sight glass
indicates the required flow rate (Fig. 37 item 4). Turn the screw
anticlockwise to increase the flow.
8. Ensure that the float is stable when the pump is running.
9. Set manual pump operation to off (See Section 14.6).
13.2
Installation of the thermal insulation
1. Refit the controller mounting moulding (Fig. 38 item 1)
onto the rear moulding.
2. Push the front thermal insulation (Fig. 38 item 2) against the
rear thermal insulation section (Fig. 38 item 3) until it clips into
place.
3

Commissioning of hydraulic station

Advertisement

Table of Contents
loading

This manual is also suitable for:

5130243

Table of Contents