Installation Place - Baxi Bioflo Installation & Servicing Instructions Manual

Pellet central heating system boiler
Table of Contents

Advertisement

For the Installer
Fig. 2
FireWIN in an installation room (more than approx. 15 % of the entire area to be heated)

2.3.3 Installation place

– The minimum service clearances from flammable materials and for connections, cleaning and maintenance must
be complied with – see point 3.2 Minimum service clearances.
–– FireWIN must be placed directly on a non-flammable base plate (e.g. accessory FIRE 030 or FIRE 032).
The configuration of the entire system must comply with technical fire protection requirements in accor-
dance with the applicable regulations, standards and guidelines.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bioflo 12 kw pear

Table of Contents