Pump Assembly Replacement - Bacharach Fyrite Pro Operation & Maintenance Manual

Combustion gas analyzer
Hide thumbs Also See for Fyrite Pro:
Table of Contents

Advertisement

5.11 Pump Assembly Replacement

Material Required:
Procedure:
1. Disassemble the analyzer as follows:
a. Remove the battery cover and the batteries, uncovering one of
the cover hold-down screws.
b. Remove and set aside all four cover hold-down screws.
c. With the analyzer on its back, remove the front cover, laying it
face down to the left of the body.
d. Carefully remove the circuit board, slipping off the battery con-
nec tor on top, and then laying the circuit board face down in the
top cover.
2. Slip off the pump motor's electrical connector from the circuit board.
3. Unscrew the pump's hold down clamp and remove it from the pump
(see Figure 5-4). Make note of how the pump wiring is routed.
4. Make note of how the tubing connects to the pump; then care ful ly
remove tubing from pump.
5. Remove the old pump and discard.
6. Install the new pump and reinstall the tubing, taking care not to
pinch or crimp the tubing. Also be sure pump wiring is routed as
was noted in Step 3.
7. Reassemble the analyzer.
Instruction 0024-9395
Fyrite Pro
• Pump, P/N 0024-3048
• #1 Phillips Screwdriver
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents