Download Print this page

Verification Steps - Avaya OAISYS NetSuite 4.2 Application Notes

With computer telephony solutions oaisys netsuite 4.2

Advertisement

6. Verification Steps

The following steps can be used to verify system operation after a field installation:
OAISYS Net Server: Avaya IP Office Connection and OAISYS Net Server links should
connect and display a Green Light.
OAISYS Call Router: OAI Server Connection link should connect and display a Green Light.
SCR; Reviewed:
WCH 7/7/2004
Solution & Interoperability Test Lab Application Notes
©2004 Avaya Inc. All Rights Reserved.
33 of 39
oaisys-ipoffice.doc

Advertisement

loading

This manual is also suitable for:

Ip office 2.0