Additional Suction Accumulator Line; Example Liquid Line Sizing - Trane RTAA-70 Installation & Maintenance Manual

R series air-cooled rotary liquid chillers
Table of Contents

Advertisement

Table 7

Additional Suction Accumulator Line

Required Length in Feet of Field Installed Suction Line Accumulator
35 Ton Circuit
Liquid Line
2 1/8" O.D.
Length in
Suction
Actual Ft.
Line
1
20
7
40
14
60
20
80
26
100
32
120
N/A
140
N/A
160
N/A
180
N/A
200
RTAA-SVX01A-EN
Installation — Remote Evaporator
40 Ton Circuit
2 5/8" O.D.
2 1/8" O.D.
Suction
Suction
Line
Line
1
5
5
14
9
23
13
32
17
N/A
21
N/A
25
N/A
29
N/A
33
N/A
37
N/A

Example Liquid Line Sizing

For this example, refer to
circuit.
1. From
Figure
22, the actual length of field installed piping is:
2. Estimate equivalent line length:
3. From
Table 4
for a 50 ton circuit, for 175 equivalent feet the OD is
1-3/8 inches.
4. In
Figure 22
there are six long-radius elbows. From
1-3/8 inch elbows, the equivalent feet is:
5. Adding equivalent feet from step #4 to step #1 gives:
6. From
Table
4, for a 50 ton circuit, for 125 equivalent feet (nearest to
130.2), the OD is 1-1/8 inches
7.
From
Table
3, for 1-1/8" OD long-radius elbows, the equivalent feet is:
8. Adding equivalent feet from step #7 to step #1 gives:
50 Ton Circuit
2 5/8" O.D.
2 5/8" O.D.
Suction
Suction
Line
Line
3
9
9
15
15
21
21
28
26
34
32
40
38
46
43
53
49
59
55
65
Table
2, 3, 4, and Figure 22, and assume a 50 ton
80+8+8+21 =117 feet
117 feet x 5=175 feet
6 elbows x 2.2 feet = 13.2 feet
13.2 feet + 117 feet = 130.2 feet
6 elbows x 1.9 feet = 11.4 feet
11.4 feet + 117 feet = 128.4 feet
60 Ton Circuit
3 1/8" O.D.
2 5/8" O.D.
Suction
Suction
Line
Line
6
14
11
21
15
27
19
33
24
40
28
46
33
52
37
N/A
41
N/A
46
N/A
Table
3, for
31/8"O.D.
Suction
Line
10
15
19
23
28
32
37
41
45
50