Appendix A Installation Checklists - Trane Tracker Version 12 Hardware Installation

Building automation system
Table of Contents

Advertisement

®
BMTK-SVN01D-EN
Appendix A
Installation checklists
Required supplies
Table 15 lists the supplies required for all Tracker installations.
Table 15. Required supplies checklist
Wiring installation
24 Vac
Comm
Optional supplies
Table 16 lists the supplies that may or may not be necessary, depending
on the Tracker installation.
Table 16. Optional supplies checklist
Inputs/output
wiring installation
Alarm relay wiring
Priority shutdown
wiring and
Meter input
Thermistor wire
Alarm relay power
supply
Alarm relay output
load
Thermistor
Item
2
18 AWG (1.02 mm
) wire recommended
24 Vac, 40 VA minimum transformer
Communication wire (see Table 7 on page 30
and Table 8 on page 31 for specifications)
Item
2
18 AWG (1.02 mm
) wire and metal conduit
2
18—22 AWG (1.02 mm
—0.643 mm
metal conduit
2
18—22 AWG (1.02 mm
—0.643 mm
pair, shielded wire
Power supply for alarm relay output (not to
exceed 24 Vac)
Load for alarm relay output (not to exceed
1 amp at 24 Vac)
Outdoor air temperature sensor
2
) wire and
2
) twisted
65