Trane IntelliPak Signature Series Installation, Owner, And Diagnostic Manual page 106

Commercial self-contained signature series, 20-80 ton, “bo” and later design sequence
Hide thumbs Also See for IntelliPak Signature Series:
Table of Contents

Advertisement

106
Trane communications interface 64
U
UCM signal conditions 53
unit components 4
unit control components 61
unit control module 5, 51, 53, 61, 67
unit handling procedure 11
unit HI communications failure 102
unit nameplate 5, 6, 11, 12, 57
UNIT OFF sequence 63
unit protective covers 28
unit start-up procedures 57
unit wiring diagrams 26
unoccupied sequence of operation 74
unoccupied zone cool setpoint failure
102
unoccupied zone heat setpoint failure
102
up and down button arrows 50
V
variable frequency drive option 69
variable water flow 68
VAV changeover contacts 61
VAV drive max output 61, 75
VCM 64
VCM vommunication failure 102
velocity pressure sensor failure 102
ventilation control module 64
ventilation override module 63
VFD 69
VFD with bypass 69
voltage imbalance 26, 95
voltage range 26
VOM 63
VOM communications failure 103
W
warnings and cautions 2
water flow fail 103
water flow switch 67
water piping 23
water piping options 67, 70
water purge 67, 72
water temperature requirements 24
waterside components 67
waterside economizer 67
waterside economizer flow control 67
waterside module 63
Index
waterside piping arrangements 23
WSM communications fail 103
WSM mixed air temp sensor fail 103
Z
zone cool setpoint failure 103
zone sensor installation 36
zone sensor options 34
zone temperature - heating 77
zone temperature control 76
SCXF-SVX01B-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents