Unpacking The Switch - Allied Telesis AT-8012M Installation Manual

At-8000 series layer 2 fast ethernet switches
Table of Contents

Advertisement

Installation

Unpacking the Switch

52
To unpack the switch, perform the following procedure:
1.
Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesyn.
2.
Place the switch on a level, secure surface.
3.
Make sure the following hardware components are included in
your switch package. If any item is missing or damaged, contact
your Allied Telesyn sales representative for assistance.
One AT-8000 Series Fast Ethernet Switch
Two mounting brackets
Eight flathead Phillips screws
AC power cord (AC switches only; Americas, EC, Australia, and
UK only)
Management cable
Documentation CD
Warranty card

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents