Electrical Connection - Miele KM 400 Installation Instructions Manual

Ceramic hobs ceramic contact grill open grill deep fat fryer
Table of Contents

Advertisement

All electrical work should be carried
out by a suitably qualified and
competent person in strict
accordance with current local and
national safety regulations (BS 7671
in the UK).
If the connection cable is damaged,
it must be replaced by a special
connection cable. Please contact
the Miele Service / Spare Parts
Department.
Installation, repairs and other work
by unqualified persons could be
dangerous. The manufacturer
cannot be held liable for
unauthorised work.
Ensure power is not supplied to the
appliance until after installation or
repair work has been carried out.
The appliance must only be
operated when built-in. This is to
ensure that all electrical parts are
shielded. Live parts must not be
exposed.
Do not connect the appliance to the
mains electricity supply by an
extension lead. These do not
guarantee the required safety of the
appliance.
Please make sure that the connection
data quoted on the data plate match
the household mains supply.

Electrical connection

Connection for each appliance should
be made via a suitable isolator or a
double pole fused spur connection unit
which complies with national and local
safety regulations and the on/off switch
should be easily accessible after the
appliance has been built in.
If the switch is not accessible after
installation (depending on country) an
additional means of disconnection must
be provided for all poles.
For extra safety it is advisable to install
a residual current device (RCD) with a
trip current of 30 mA.
When switched off there must be an
all-pole contact gap of 3 mm in the
isolator switch (including switch, fuses
and relays).
Important U.K.
This appliance is supplied for
connection to a single phase 230-240 V
50 Hz supply with a 3-core cable.
The wires in the mains lead are
coloured in accordance with the
following code:
Green/yellow = earth
Blue
= neutral
Brown
= live
WARNING
THIS APPLIANCE MUST BE
EARTHED
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents