HP 10bII+ User Manual page 125

Financial calculator
Hide thumbs Also See for 10bII+:
Table of Contents

Advertisement

At what temperature would the manager predict to sell 800 drinks? How many employees
will be needed for tomorrow's predicted temperature of 43
Table 12-3 Example entering statistical data, opening the editor, and predicting
Keys
\t
DGÆYJV¡
DVÆVJV¡
DgÆjGV¡
11111
M
]LY
g::\Z
\«\5d
YD\W\5G
aG::4
Continuing with this example, modify this data by adding more points: two additional days
of sales and their corresponding temperatures. The first day's temperature of 43
the sale of 1,023 cold drinks. The next day's temperature at 37
drinks.
o
C?
Display
Description
STAT CLR
Clears the statistics memory.
(message flashes briefly,
then disappears)
1.00
Enters first ordered pair.
2.00
Enters the second ordered pair.
3.00
Enters the third ordered pair.
1 32.00
Open the editor. Displays X
annunciator.
3 725.00
Scroll and verify the data points,
starting with the x-value of the
first pair. The y-value of the third
pair is displayed.
Exit the editor.
0.00
Set the regression model to
power. 4–POWER flashes briefly
after
disappears.
39.49
Predict the temperature.
.988080878
Display the correlation
coefficient.
1,053.49
Predict the number of drinks sold
tomorrow.
5.27
Manager should have at least 6
employees at work tomorrow to
cover the expected load.
Y
is pressed, then
o
C resulted in
o
C resulted in the sale of 685
Statistical Calculations 117

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents