Input Connections; Introduction - Fluke 434 User Manual

Three phase power quality analyzer
Hide thumbs Also See for 434:
Table of Contents

Advertisement

Introduction

This chapter explains how to make connection to the power distribution system under test
and how to adjust the Analyzer settings.
Check that the Analyzer setup meets the characteristics of the system under test and the
accessories that are used. This concerns:
wiring configuration
nominal frequency
nominal voltage
properties of voltage leads and current clamps
The actual setup is shown in the welcome screen that appears after power up. To change
the setup, refer to Chapter 20.

Input Connections

The Analyzer has 4 BNC-inputs for current clamps and 5 banana-inputs for voltages.
Self-adhesive decals are supplied corresponding to wiring color codes used in the USA,
Canada, Continental Europe, the UK, and China. Stick the decals that fit to your local
wiring codes around the current and voltage inputs as shown in Figure 6-1.
Input Connections
Chapter 6
6-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

435

Table of Contents