NEC Storage Performance Monitor/Optimizer User Manual page 120

Table of Contents

Advertisement

Chapter 6 Operation of Performance Optimization Function (GUI)
Double-clicking a logical disk
will display destination candidate
Work Disks for Optimization.
Figure 6-21 Selecting Moved Material Logical Disks/Selecting Work Disk for Optimization
(iii) Start LD Movement/Register LD Movement Schedule
After deciding logical disk movement and work disk for optimization, start moving or register a movement
schedule. Start of moving or registration of moving is specified on the Start LD Movement dialog. Four
procedures are provided for displaying the Start LD Movement dialog. Display the Start LD Movement dialog
with one of the following procedures:
Popup menu
Select a work disk for optimization of the movement target, on the Work Disk for Optimization Display Area,
and display a popup menu by right-clicking. Select [Start LD Movement] on the popup menu.
Menu
Select a work disk for optimization of the movement target, on the work disk for optimization display area, and
select [Operation]
Tool Bar button
Select a destination Work Disk for Optimization from the Work Disk for Optimization Display Area and then
click the [Start LD Movement] button on the tool bar.
Replacement Plan dialog
Click the [Start LD Movement] button on the Replacement Plan dialog. Refer to 6.2.5 "Replacement Plan"
for details of Replacement Plan dialog.
Figure 6-22 shows an example of displayed Start LD Movement dialog, and Table 6-18 provides descriptions of
the areas in the dialog.
[Start LD Movement].
II-38
The Busy Ratio of the source
RANK is displayed in the
"Before movement
After
movement" format.
The Busy Ratio of the destination
RANK is displayed in the
"Before movement
After
movement" format.

Advertisement

Table of Contents
loading

Table of Contents