Controls And Indicators; Starting The Generator Set; Stopping The Generator Set; Tp-6195 - Kohler 12RES Operation And Installation Instructions Manual

Residential/commercial generator sets, controller: advanced digital control
Hide thumbs Also See for 12RES:
Table of Contents

Advertisement

2.3.1
Controls
and Indicators
Figure 2-2 describes the controls and indicators located
on the generator set controller.
The LED display indicates generator
set status as
shown in Figure 2-2. The display is activated by a start
or run command and remains active until the generator
set master switch is moved to the OFF/RESET position
or
power
to the
controller
is removed.
If the
factory-installed
continuous
power mode jumper has
been disconnected, the LED display turns off 48 hours
after generator set shutdown.
See Section 2.3.6.
The buttons on the controller keypad are used only for
system configuration and adjustment.
The controller is
factory-set
and should not require configuration
or
adjustment under normal operating conditions. Contact
an authorized distributor/dealer
or service technician if
adjustments are required.
2.3.2
Starting the Generator
Set
The following procedures describe the actions required
to start the generator set.
The controller attempts to start the generator set three
times (three crank cycles, 15 seconds crank and 15
seconds off). If the generator set does not start in three
attempts, the system shuts down on an overcrank fault.
Local Starting
Move the generator set master switch to the RUN
position to immediately start the generator set.
start/stop switch.
(A remote start/stop switch can be
connected to controller leads 3 and 4. See the wiring
diagrams in Section 5).
2.3.3
Stopping
the Generator
Set
The following procedures describe the actions required
to stop the generator set.
Local Stopping
1. Run the generator
set at no load for at least
2 minutes to ensure adequate engine cooldown.
2. Move the generator
set master
switch to the
OFF/RESET position. The engine stops.
Automatic Stopping
With the generator
set master switch in the AUTO
position and an automatic transfer switch (ATS) or other
automatic device connected to controller leads 3 and 4:
1.
2.
The ATS or other device disconnects the load from
the generator set.
If the ATS is equipped with an engine cooldown
time delay, the generator set continues to run for a
preset engine cooldown time.
Note: There is no engine cooldown time delay on
the ADC controller.
3. The ATS or other device opens the connection
between controller leads 3 and 4. The generator
set shuts down.
Auto (Automatic) Starting
Move the generator set master switch to the AUTO
position to allow startup by the ATS or the remote
Control
or Indicator
Item
Description
LED display
Runtime hours
Displays total generator set runtime hours while the generator set is running.
Crank indication
Displays CC1,
CC2,
or CC3
to indicate the first, second or third attempt to start the
engine.
The last digit flashes during the crank cycle rest periods.
Fault codes
Flashes a 2- or 3-letter fault code to indicate various fault conditions.
See Section 2.3,4.
Software version
See TP-6196, Generator Set Service Manual.
number
Keypad
Select and arrow
The keypad is used for controller setup and adjustment only. Have setup and adjustments
buttons
performed only by an authorized distributor/dealer,
The setup and adjustment functions are
password-protected.
Generator set master
Three-position
Switch functions as the generator set operation and controller reset switch,
switch
switch
Figure 2-2
ADC 2100 Controls and Indicators
4
Section 2 Operation
TP-6195
1/04

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8.5res

Table of Contents