Basement Or Main Floor; Walkout Basement Or Main Floor; Hearth Stove - Existing Reline; Main Floor - Vertical - Pelpro HHPP2 Owner's Manual

Acutron control with memory & fan trim
Hide thumbs Also See for HHPP2:
Table of Contents

Advertisement

These styles of installation are highly recommended, due to possible backpressure in the exhaust caused by
airflow around the outside of the structure, snow build-up, or power failure, etc.. These designs will improve
venting performance and provide natural draft to help evacuate smoke from the appliance in case of power
failure.
Follow the same basic steps in locating your appliance, attaching the exhaust system and outside air intake to
your stove as the previous examples.
Floor / Ceiling
9
10
8
7
12"
6
12"
5
Ground Level
9
4
3
1
2
8

Hearth Stove - Existing Reline

7
24"
6
9
5
8"
16"
Optional
Metal Plate
4
1
10
3
2
Outside Air may be obtained from a suitable duct passing through the
ash clean-out opening.
Ensure the chimney top is properly sealed to prevent intrusion of
weather and down drafts with suitable flashings, collars, and sealants.
PelPro Home & Shop Heater
F
F
REESTANDING
REESTANDING

Basement or Main Floor

1 Pipe Adapter
Clean Out Tee & Cap
2
Tee Support Bracket
3
4
36" Pipe Length
12" Pipe Length
5
6
12" Adjustable Pipe Length
90 Deg Elbow
7
8
Wall Thimble
9
24" Pipe Length x 2
10
Horizontal Rain Cap
Tube of RTV Silicone
Roll of Foil Tape
3/8" Stainless Self-Tapping
Screws x 27
2" Wood Screws x 10
1 Pipe Adapter
Single Wall Stainless Steel
2
Clean Out Tee & Cap
3
Dripless Connection
"All Fuel" Stainless Steel
4
Flex Liner
Liner Support
5
6
Roof Flashing
7
Storm Collar
Vertical Rain Cap
8
9
Hi Heat Insulation
10
PL Vent Length
Tube of RTV Silicone
Roll of Foil Tape
3/8" Stainless Self-Tapping
Screws x 27
6"
I
I
NSTALLATION
NSTALLATION
. . . C
. . . C

Walkout Basement or Main Floor

Pipe Adapter
1
12" Pipe Length
2
12" Adjustable Pipe Length
3
4
Clean Out Tee & Cap
36" Pipe Length
5
6
Tee Support Bracket
7
90 Deg Elbow
8
Horizontal Rain Cap
9
Wall Thimble
Tube of RTV Silicone
Roll of Foil Tape
3/8" Stainless Self-Tapping
Screws x 21
2" Wood Screws x 10
Options

Main Floor - Vertical

1
Pipe Adapter
2
Clean Out Tee & Cap
3
3 x 60" (15') Pipe Length
4
Tee Support Bracket
Ceiling Support / Firestop Spacer
5
6
Roof Flashing
7
Storm Collar
8
Vertical Rain Cap
Tube of RTV Silicone
Roll of Foil Tape
3/8" Stainless Self-Tapping
Screws x 27
2" Wood Screws x 10
www.pelprostoves.com
'
'
ON
T
ON
T
9
1
2
8
7
6
5
4
3
1
2
7
8
6
5
4
3
19
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hspp3Hhpp3Hspp2

Table of Contents