Toshiba Tecra A8 Maintenance Manual page 72

Maintenance manual
Hide thumbs Also See for Tecra A8:
Table of Contents

Advertisement

2 Troubleshooting Procedures
Procedure 2
Debugging Port Check (Boot Mode)
Check the D port status by a debug port test. The tool for debug port test is shown below.
The test procedures are follows:
1. Connect the debug port test cable to the connector CN3490 of the system board. For
disassembling to connect the test cable, refer to Chapter 4.
2. Connect the debug port test cable and RS-232C cross-cable to the test board.
3. Connect the RS-232C Cross-cable to the PC that displays the test results.
4. Boot the computer in DOS mode.
5. Execute GETDPORT.COM in the text menu in CPU REAL mode. (Insert the FD for
starting D port into FDD and input "FD starting drive:>dport".)
The D port status is displayed in the following form;
6. When the D port status is FFFF (normal status), go to Procedure 4. When the D port
status falls into any other status than FFFF, go to Procedure 3.
2-24
[CONFIDENTIAL]
Figure 2-2 A set of tool for debug port test
TECRA A8 /Satellite Pro A120 Maintenance Manual (960-573)
2.4 System Board Troubleshooting

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tecra a8 seriesSatellite pro a120

Table of Contents