Alignment Procedure; Attaching And Leveling Table Mounting Support Channels - Craftsman 113.19770 Owner's Manual

10-inch radial saw
Table of Contents

Advertisement

ALIGNMENT
PROCEDURE
IMPORTANT:
IN ORDER
TO OBTAIN
MAXIMUM
CUTTING
ACCURACY,
THE
FOLLOWING
SIX
STEPS
MUST
BE
CAREFULLY
FOLLOWED.
BECOME
THOROUGHLY
FAMILIAR
WITH
THESE
STEPS
SO THAT
YOU CAN ALWAYS
MAINTAIN
YOUR
SAW
IN
PROPER
ALIGNMENT.
THE
ACCURACY
OF
EACH
ADJUSTMENT
IS
ALWAYS
DEPENDENT
UPON
THE ACCURACY
OF THE PRECEDING
ADJUSTMENT.
After
following
the
6
step
assembly
and
alignment
procedure
and the
Basic
Saw
operation
section
refer
to
Trouble
Shooting
section
if any
difficulty
is experienced
when performing
any sawing
operation.
STEP ONE
NOTE:
The following
adjustment,
performed
properly,
will
result
in the work
table
being parallel
to the arm.
ATTACHING
AND
LEVELING
TABLE
MOUNTING
SUPPORT
CHANNELS.
1.
Attach
table
rnounting
support
channels
with
four
square
head
5/1 6-18 x 3/4 screws, Iockwashers
and flat
washers and nuts. POSITION
SCREWS
IN CENTER
OF
CHANNEL
SLOTS,
finger
tight
to permit
channels
to
"slip"
against
the base when leveling.
2.
Release bevel
lock
lever,
move
bevel
index
pin to left
and rotate
the motor
to position
saw blade, end of shaft
down.
Lock
bevel lock.
3.
Unlock
and
hold
arm
control
lever
in
index
release
position
as
shown.
Position
arm
against
left
stop
(approximately
50 ° miter).
Loosen
carriage
lock
knob
and position
carriage
directly
over
left hand channel.
NOTE:
For
safety
reasons
in accordance
with
the UL
standard,
stops
have
been
provided
to
prevent
360 °
rotation
of the; radial
arm.
4.
Slide
the
arbor
wrench
handle
between
end of motor
shaft
and
mounting
channel
to
act as a feeler
gauge.
Carefully
lower
the
motor
with
elevation
crank
until
the end of shaft
is just touching
the arbor
wrench.
The
wrench
should
slide
back
and
forth
with
only
slight
resistance.
Tighten
screw "A".
NOTE:
Do not change
this elevation
setting
until
both
left
and
right
hand
table
support
channels
have been
adjusted.
TABLE
MOUNTING
SUPPORT
CHANNEL
\
SQUARE
HD.
SCREW
s/] 6- ] 8 x 3/4
TABLE
MOUNT!
NG
SUPPORT
CHANNEL
SCREWS
HERE
BASE
[_xQ__
FRONT
MOUNT
RAILS
USING
THESE HOLES
INDEX
RELEASE
UNLOCK
POSITION
LOCK
j_
4
ARBOR
WRENCH
SCREW
"A"
5.
Move
arm
and
carriage
to
screw
"B'"
and
tighten
support
in the same manner.
6.
Move
arm
and carriage
to
right
hand
support
channel
and level in the same manner
you adjusted
the left hand
support
channel.
7.
Recheck
both
support
channels
to
make
sure
that
tighteninj
screws
did
not
affect
the
accuracy
of the
adjustment.
8.
Elevate
saw
and
place
motor
in
vertical
position
to
provide
clearance
for
installation
of front
(work)
table.
Y
-C
f
!
_/
SUPPORT CHANNEL
"SCREW /
"B"
O-EFT HAND)
SCREW
"A"
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

113.197750

Table of Contents