Craftsman 536.886261 Operator's Manual page 22

9.0 horsepower electric start 26-inch dual stage
Table of Contents

Advertisement

Available languages

Available languages

3.
Remove
the bottom
panel.
Bolt
Bottom
Panel
from the engine pulley. Replace
the auger drive belt with an original
factory replacement belt available
from an authorized service center.
Auger
Housing
8. Install the new auger drive belt
onto the auger drive pulley and
onto pulley.
9. Adjust the auger drive belt. See
"How To Adjust The Auger Drive
Belt" in the Maintenance section.
Figure 21
4. Remove screw from belt cover.
Remove the belt cover (see
Figure 19).
5. Loosen the belt guide. Pull the belt
guide away from the auger drive
pulley (see Figure 22).
6. Pull the idler pulley away from the
auger drive belt.
7. Remove the old auger drive belt
10. Adjust the belt guide. See "How To
Adjust The Belt Guide" in the Main-
tenance section.
11. Install the belt cover. Tighten
screw (See Figure 19).
12. Check the adjustment of the cables.
See "How To Check And Adjust The
Cables" in the Maintenance section.
13. Install the bottom
panel (see
Figure 21).
14. Tighten the bolts on each side of
the bottom
panel.
from the auger
drive
pulley
and
15. Connect
the spark plug wire.
X__'_'_
Traction Drive Belt
Engine Pulley
Beit Guide
Auger Drive Pulley
'\
_CJl/_
Auger Idler Pulley
Auger Drive Belt
E-Ring
Swing Plate
Axle Rod
Traction Drive
Spring
Traction
Drive Belt
Traction
Drive Pulley
Engine
Pulley
Figure 22
F-011050L
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents