Step 4: Install Hood Below Soffit - GE Monogram ZV881WSS Installation Instructions Manual

Professional vent hoods 48" models/36" models/30" models
Table of Contents

Advertisement

4
• Drill 3/16" pilot holes through the shims and
Step
• Hold the hood against the soffit and secure
Install Hood
• For additional support and to minimize
Below Soffit
• Drive lag screws through the rear panel of
INSTALLATION
UNDER A SOFFIT
(SKIP THIS STEP
IF SOFFIT IS NOT
USED.)
ZV671WSS, ZV670WSS
36" Hood Top View - Front Side
4"
Junction
6-1/4"
Box
8"
10-1/2"
ZV681YSS, ZV680YSS
36" Hood Top View - Front Side
8-1/2"
Junction
5-1/2"
Box
14-7/16"
12-7/16"
into the soffit studs.
with 6 lag screws with washers.
vibration during operation, we recommend
that the hood be secured to the back wall.
the hood and into the wall studs.
1"
3-1/8"
4-1/4"
3"
12"
7"
8"
3"
2-7/8"
3/4"
10-1/2"
23"
Back Side
5-1/2"
3-1/8"
4-1/4"
3"
12"
7"
14-7/16"
3"
2-7/8"
3/4"
12-7/16"
35-7/8"
Back Side
5-1/2"
5-1/2"
11-7/16"
Installation
8-1/4"
6-1/8"
6-1/4"
5-3/4"
4-1/2"
14-11/16"
6-1/8"
5-1/8"
5-7/8"
10-15/16"
ZV371YSS, ZV370YSS
30" Hood Top View - Front Side
2-1/2"
Junction
4-1/4"
Box
7"
11-7/16"
3/4"
12-7/16"
12-7/16"
29-7/8"
Back Side
Professional Vent Hoods
SOFFIT INSTALLATION
ZV881WSS, ZV880WSS
48" Hood Top View - Front Side
6-1/4"
6-1/8"
4-1/2"
Junction
Box
Back Side
35"
ZV891YSS, ZV890YSS
48" Hood Top View - Front Side
6-1/4"
6-1/8"
4-1/2"
Junction
Box
Back Side
10-15/16"
47-7/8"
3-1/8"
3"
12"
3"
2-7/8"
8-1/4"
2-3/4"
3-1/2"
12"
3-1/2"
2-1/4"
4-1/2"
14-11/16"
2-3/4"
3-1/2"
12"
3-1/2"
2-1/4"
10

Advertisement

Table of Contents
loading

Table of Contents