GE Monogram ZV800 Installation Instructions Manual

GE Monogram ZV800 Installation Instructions Manual

36” chimney vent hood
Hide thumbs Also See for Monogram ZV800:

Advertisement

Quick Links

Installation
Instructions
If you have questions, call 800.626.2000 or visit our website at: www.monogram.com
36" Chimney Vent Hood
ZV800

Advertisement

Table of Contents
loading

Summary of Contents for GE Monogram ZV800

  • Page 1: Installation Instructions

    Installation Instructions If you have questions, call 800.626.2000 or visit our website at: www.monogram.com 36” Chimney Vent Hood ZV800...
  • Page 2: Safety Information

    BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT • — Save these instructions for local inspector’s use. IMPORTANT • — Observe all governing codes and ordinances. Note to Installer • — Be sure to leave these instructions with the Consumer. Note to Consumer •...
  • Page 3: Table Of Contents

    CONTENTS Design Information Product Dimensions and Clearances ...3 Installation Options ...3 Advance Planning, Ductwork, Framing ...4 Power Supply ...4 Duct Fittings...5 Installation Preparation Tools and Materials Required ...6 Remove the Packaging ...6 Wall Mount Installations ...7 Installation Below a Wall Cabinet ...7 Check Installation Hardware ...8 Ductwork, Wiring Locations...9 Wall-Mounted Installation –...
  • Page 4: Advance Planning, Ductwork, Framing

    Installation Preparation ADVANCE PLANNING • Determine the exact location of the vent hood. • Plan the route for venting exhaust to the outdoors. • Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 100 ft. equivalent length for any duct configurations.
  • Page 5: Duct Fittings

    6” Round roof vent *Actual length of straight duct plus duct fitting equivalent. Equivalent length of duct pieces are based on actual tests conducted by GE Evaluation Engineering and reflect requirements for good venting performance with any ventilation hood. Total Equivalent...
  • Page 6: Tools And Materials Required

    Installation Preparation TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED Tape measure Knife Spirit level Wire cutter/stripper Wire nuts Electric drill with 1/8" and 3/8" bits Phillips and flat blade screwdrivers Hammer Pliers Safety glasses Duct tape Tape to mount template Gloves to protect against sharp edges 120V 60Hz.
  • Page 7: Wall Mount Installations

    12” deep. • The hood installation height is determined by the ceiling height. • The hood installation height must be 24” Min. above the cooking surface. Wall Mount ZV800 Installation Heights *Possible VENTED RECIRCULATING Installation Height Installation Height 7’11”...
  • Page 8: Check Installation Hardware

    Installation Preparation CHECK INSTALLATION HARDWARE Locate the hardware accessory box packed with the hood and check contents. 4 wood screws Mounting bracket Discharge damper 2 stainless steel filters “L” Brackets with hardware package for cabinet-mounted installations. Contains 10 Phillips head screws to secure the brackets to the cabinet (8 required, 2 extra) 4 wall...
  • Page 9: Ductwork, Wiring Locations

    Installation Instructions WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE DUCTWORK, WIRING LOCATIONS Determine the exact location of the vent hood. • Locate the template packed with the literature. – Measure 36” from the floor to the top of the cooking surface. Add hood installation height determined on page 7.
  • Page 10: Step 2, Install Mounting Bracket

    Installation Instructions WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE INSTALL MOUNTING BRACKET This vent hood must be secured to the horizontal support or wall studs. • With the template taped in place, use a punch to mark all mounting screw locations. • Drill 1/8” pilot holes at the 6 punched locations. •...
  • Page 11: Step 4, Prepare The Hood

    WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE PREPARE THE HOOD • Remove the hood from the box. Remove packaging and tape. Electrical panel • Remove one screw on each side of the cover on the electrical panel. Lift off the cover and set aside with screws.
  • Page 12: Step 6, Connect Ductwork

    WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE CONNECT DUCTWORK • Install ductwork, making connections in direction of airflow as illustrated. • Push duct over the exhaust outlet and damper. • Secure joints in ductwork with sheetmetal screws. • Wrap all duct joints with duct tape for an airtight seal. •...
  • Page 13: Step 8, Install Duct Covers

    Installation Instructions WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE INSTALL DUCT COVERS • Place the decorative duct covers on top of the hood. Mounting screws NOTE: The inside (upper) duct piece has holes on one end. The holes are intended for use when the hood is installed for recirculating purposes.
  • Page 14: Wall-Mounted Installation-Recirculating

    WALL-MOUNTED INSTALLATION—RECIRCULATING DUCTWORK, WIRING LOCATIONS • Determine the exact location of the vent hood. • Locate the template packed with the literature. • Measure 36” from the floor to the top of the cooking surface. Add hood installation height determined on page 7.
  • Page 15: Step 2, Install Mounting Bracket

    Installation Instructions WALL-MOUNTED INSTALLATION—RECIRCULATING INSTALL MOUNTING BRACKET This vent hood must be secured to the horizontal support or wall studs. • With the template taped in place, use a punch to mark all mounting screw locations. • Drill 1/8” pilot holes at the 6 punched locations. •...
  • Page 16: Step 4, Mount The Hood

    Installation Instructions WALL-MOUNTED INSTALLATION—RECIRCULATING MOUNT THE HOOD Install a wood screw on each side of the mounting frame • Lift the hood onto the mounting bracket. • Check to be sure it is level. • Install wood screws through the hood and into the wall on each side of the mounting bracket.
  • Page 17: Step 6, Connect Electrical

    WALL-MOUNTED INSTALLATION—RECIRCULATING CONNECT ELECTRICAL Verify that power is turned off at the source. WARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L. approved anti-oxidant compound and aluminum-to-copper connectors.
  • Page 18: Step 8, Install Filters

    Installation Instructions WALL-MOUNTED INSTALLATION—RECIRCULATING INSTALL FILTERS Charcoal filter • Remove protective film on the filters. • Install the black charcoal filter into the center opening. Metal grease filters • Tip filters into the slots at the rear of the opening. Lift the filter lock and pull forward until the filter rests in the slots.
  • Page 19: Under-Cabinet Installation

    Installation Instructions UNDER-CABINET INSTALLATION CABINET REQUIREMENTS This hood may be installed beneath a wall-mounted cabinet. • If the cabinet has been installed, it must be removed so that wall framing supports can be added. 24” Min. The cabinet must be at least 20” high between the bottom frame and the inside top.
  • Page 20: Step 1, Install Framing For Hood Support

    Installation Instructions UNDER-CABINET INSTALLATION INSTALL FRAMING FOR HOOD SUPPORT IMPORTANT: Framing must be capable of supporting 100 lbs. Centerline of Centerline of Installation installation Space space If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template. •...
  • Page 21: Step 3, Cut The Opening

    UNDER-CABINET INSTALLATION CUT THE OPENING If the cabinet has been installed, remove it from the wall. • Use the Top Cabinet Template to locate and cut a hole in the bottom of the cabinet. • If necessary, place the template on top of the cabinet to accurately cut a matching hole.
  • Page 22: Step 6, Mount The Hood

    UNDER-CABINET INSTALLATION MOUNT THE HOOD Install a wood screw on each side of the mounting frame • Carefully, lift the hood into the cabinet. Guide the hood upwards to meet the ductwork. IMPORTANT: One person must hold the hood in place while the other drives the screws into the mounting frame.
  • Page 23: Step 8, Connect Electrical

    Installation Instructions UNDER-CABINET INSTALLATION CONNECT ELECTRICAL WARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L. approved anti-oxidant compound and aluminum-to-copper connectors. ADVERTISSEMENT : Si la maison n’est pas câblee avec deux fils et un fil de terre, l’installateur doit installer un fil de terre.
  • Page 24 NOTE: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram 1.800.444.1845. NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. Pub. No. 49-80267 10-04 JR Printed in Italy ®...

Table of Contents