Texas Instruments TAS 5611/13PHD2EVM User Manual

Texas Instruments TAS 5611/13PHD2EVM User Manual

Evaluation module

Advertisement

Quick Links

This user's guide describes the operation of the evaluation module for the TAS5613 150W (TAS5611
125W) Stereo Feedback Analog-Input Digital Amplifiers from Texas Instruments. The user's guide also
provides measurement data and design information including the schematic, BOM, and PCB layout.
.....................................................................................................................
1
1.1
1.2
2
2.1
2.2
2.3
2.4
2.5
2.6
....................................................................................................................
3
3.1
3.2
4
4.1
1
2
3
Figure 3. PBTL Mode Configuration
1
2
3
4
Related Documentation from Texas Instruments
PurePath is a trademark of Texas Instruments.
SLOU286 - December 2009
Submit Documentation Feedback
Contents
................................................................................
......................................................................................................
..........................................................................................................
.................................................................................
................................................................................................
...............................................................................................
..............................................................................................
...............................................................................................
............................................................................
.....................................................................................................
.........................................................................................
.................................................................................................
List of Figures
........................................................................
......................................................................................
List of Tables
....................................................................................
..........................................................................................
...........................................................................
Copyright © 2009, Texas Instruments Incorporated
TAS5611/13PHD2EVM
........................................................
.......................................................................
..............................................
.......................................................................
User's Guide
SLOU286 - December 2009
2
3
3
5
5
5
5
5
6
6
7
7
8
8
8
8
3
4
7
2
5
8
8
1
TAS5611/13PHD2EVM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAS 5611/13PHD2EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments TAS 5611/13PHD2EVM

  • Page 1: Table Of Contents

    This user’s guide describes the operation of the evaluation module for the TAS5613 150W (TAS5611 125W) Stereo Feedback Analog-Input Digital Amplifiers from Texas Instruments. The user’s guide also provides measurement data and design information including the schematic, BOM, and PCB layout.
  • Page 2: Overview

    Overview The TAS5611/13PHD2EVM PurePath™ Premier Pro customer evaluation module demonstrates the integrated circuit TAS5611 or TAS5613PHD from Texas Instruments (TI). The TAS5611 and TAS5613PHD is high-performance, integrated Stereo Feedback Analog-Input Digital Amplifier Power Stages designed to drive 4Ω speakers at up to 150W per channel for TAS5613PHD and 125W per channel for TAS5611PHD.
  • Page 3: Tas5611/13Phd2Evm Features

    2 x Analog Input Speaker Output MODULE Power Supply Figure 1. Integrated PurePath™ Digital Amplifier System PCB Key Map Physical structure for the TAS5611/13PHD2EVM is illustrated in Figure SLOU286 – December 2009 TAS5611/13PHD2EVM Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 4: Physical Structure For The Tas53630Phdevm (Approximate Layout)

    PBTL PVDD (J15) RESET (SW11) DIFF INPUT DIFF INPUT (J24) (J25) JUMPER1 JUMPER2 +12V FAN CONTROL (J22) Figure 2. Physical Structure for the TAS53630PHDEVM (Approximate Layout) TAS5611/13PHD2EVM SLOU286 – December 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 5: Quick Setup Guide

    On opening the TAS5611/13PHD2EVM package, ensure that the following items are included: • 1 pc. TAS5611/13PHD2EVM board using one TAS5611PHD or one TAS5613PHD. If any of the items are missing, contact the Texas Instruments Product Information Center nearest you to inquire about a replacement. Power Supply Setup To power up the EVM, one power supply are needed.
  • Page 6: Speaker Connection

    BTL or PBTL. Input signal to RCA connector J20 when operating PBTL mode. J21 is disabled. In PBTL mode, the load has to be connected according to Figure TAS5611/13PHD2EVM SLOU286 – December 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 7: Protection

    (SLAS681) (SLAS676) for further explanation. This mean that the device restart itself after an error occasion and report through the SD error signal. SLOU286 – December 2009 TAS5611/13PHD2EVM Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 8: Fault Reporting

    Schematic (4 pages) • Parts List (1 pages) • PCB Specification (1 page) • PCB Layers (6 pages) • Heat-Sink Drawing (1 page) • Inductor (1 page) Design Documents SLOU286 – December 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 9 Evaluation Board/Kit Important Notice Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 10 TAS5613PHD2EVM TAS5613PHD2EVM Rev: Rev: Rev: 1.00 1.00 1.00 Copyright 2008 Texas Instruments, Inc - All rights reserved - The TI and PurePath Digital logos are trademarks of Texas Instruments. Page Title: Page Title: Page Title: Disclaimer Disclaimer Disclaimer Size: Size:...
  • Page 11 AUDIO/IMAGING GROUP AUDIO/IMAGING GROUP AUDIO/IMAGING GROUP Home Audio Amplifiers Home Audio Amplifiers Home Audio Amplifiers ALL RIGHTS RESERVED ALL RIGHTS RESERVED ALL RIGHTS RESERVED TEXAS INSTRUMENTS INCORPORATED TEXAS INSTRUMENTS INCORPORATED TEXAS INSTRUMENTS INCORPORATED Project: Project: Project: TAS5613PHD2EVM TAS5613PHD2EVM TAS5613PHD2EVM Rev:...
  • Page 12 Home Audio Amplifiers C83 150pF C83 150pF ALL RIGHTS RESERVED ALL RIGHTS RESERVED ALL RIGHTS RESERVED 1st order high pass at 1.6Hz TEXAS INSTRUMENTS INCORPORATED TEXAS INSTRUMENTS INCORPORATED TEXAS INSTRUMENTS INCORPORATED & 2nd order active low pass at 80kHz Project: Project: Project:...
  • Page 13 AUDIO/IMAGING GROUP AUDIO/IMAGING GROUP AUDIO/IMAGING GROUP Home Audio Amplifiers Home Audio Amplifiers Home Audio Amplifiers ALL RIGHTS RESERVED ALL RIGHTS RESERVED ALL RIGHTS RESERVED TEXAS INSTRUMENTS INCORPORATED TEXAS INSTRUMENTS INCORPORATED TEXAS INSTRUMENTS INCORPORATED Project: Project: Project: TAS5613PHD2EVM TAS5613PHD2EVM TAS5613PHD2EVM Rev:...
  • Page 14 OPA1632 / High-Performance, Fully-Differential U15 U16 Audio Opamp (SO8) Texas Instruments OPA1632D LM317 / 0.5A Positive Adjustable Regulator U12 U13 (DCY) Texas Instruments LM317MDCY TL2575HV-15I / 15V/1-A SIMPLE STEP-DOWN SWITCHING VOLTAGE REGULATORS (KTT5) Texas Instruments TL2575HV-15IKTTR 1 of 2 17.Dec. 2009...
  • Page 15 TAS5611_13PHD2EVM Parts List (1.00).xls SCREW11 SCREW12 SCREW13 SCREW14 SCREW15 SCREW16 M3x6 Pan Head, Pozidriv, A2 Screw Bossard BN 81882 M3x6 WASHER11 WASHER12 WASHER13 WASHER14 WASHER15 WASHER16 M3 Stainless Steel Spring Washer Bossard BN 760 M3 STANDOFF11 STANDOFF12 STANDOFF13 STANDOFF14 M3x10 Aluminium Stand-off Ettinger 05.03.108 2 pins / 1 row / 2.54mm Pitch Vertical Male...
  • Page 16 A858-PCBSPEC-001(1.00).doc Jonas Holm TAS5613PHD2EVM PCB SPECIFICATION Version 1.00 BOARD IDENTIFICATION: A858-PCB-001(1.00) BOARD TYPE: DOUBLE-SIDED PLATED-THROUGH BOARD LAMINATE TYPE: LAMINATE THICKNESS: 1.6mm TOP LAYER COPPER THICKNESS: 70μm (INCL. PLATING EXTERIOR LAYER) BOTTOM LAYER COPPER THICKNESS: 70μm (INCL. PLATING EXTERIOR LAYER) COPPER PLATING OF HOLES: >25μm MINIMUM HOLE DIAMETER 0.3 mm...
  • Page 26 9 – 11 µH @ 0.1Vrms/10kHz Test: Inductance: pin 1 –2 Release date: 2005-04-12, Jonas Svendsen / Kim Madsen Texas Instruments Denmark A/S VAT-no. 20 53 16 73 Lyngby Hovedgade 4 Phone: +45 96 34 68 68 DK-2800 Kgs. Lyngby...
  • Page 27: Important Notice

    IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.

This manual is also suitable for:

Tas5611phd2evmTas5613phd2evm

Table of Contents